#NameTypeCapacityStatusStart
1Banten Suralaya power stationJawaCoal6.03 GWOperating1984
2Tanjung Jati B power stationJawaCoal4.64 GWOperating2006
3Weda Bay power stationMalukuCoal4.54 GWOperating2020
4Sulawesi Labota power stationSulawesiCoal3.36 GWOperating2021
5Xinyi Group captive power stationSumateraCoal2.50 GWAnnounced
6Cilacap Sumber power stationJawaCoal2.26 GWOperating2006
7Gallant Venture power stationSumateraCoal2.25 GWConstruction
8AlamTri Aluminum Smelter power stationKalimantanCoal2.12 GWConstruction2025
9Sulawesi Mining power stationSulawesiCoal2.08 GWOperating2015
10Hongshi Silikon power stationJawaCoal2.00 GWAnnounced
11Jawa-7 power stationJawaCoal1.98 GWOperating2019
12Central Java Power ProjectJawaCoal1.90 GWOperating2022
13Delong Nickel Phase II power stationSulawesiCoal1.84 GWOperating2020
14PT Halmahera Persada Lygend Nickel Smelter power stationMalukuCoal1.63 GWOperating2020
15Cirebon power stationJawaCoal1.58 GWOperating2012
16Bangko Tengah power stationSumateraCoal1.32 GWOperating2023
17Paiton-2 power stationJawaCoal1.32 GWOperating2000
18Banten Lontar power stationJawaCoal1.26 GWOperating2011
19Paiton-1 power stationJawaCoal1.23 GWOperating1999
20Mempawah SGAR power stationKalimantanCoal1.20 GWPre-construction2028
21Sumatera Hybrid power stationSumateraCoal1.20 GWAnnounced2032
22Pelabuhan Ratu power stationJawaCoal1.05 GWOperating2013
23Indramayu power stationJawaCoal990 MWOperating2010
24Pangkalan Susu power stationSumateraCoal840 MWOperating2014
25Paiton-3 power stationJawaCoal815 MWOperating2012
26Delong Nickel Phase III power stationSulawesiCoal810 MWOperating2021
27PLN Paiton power stationJawaCoal800 MWOperating1993
28Perawang Mill power stationSumateraCoal790 MWOperating2000
29East Halmahera power stationMalukuCoal760 MWPre-construction2023
30Sumsel-1 power stationSumateraCoal700 MWOperating2025
31Tanjung Awar-Awar power stationJawaCoal700 MWOperating2012
32Nagan Raya power stationSumateraCoal670 MWOperating2013
33Adipala power stationJawaCoal660 MWOperating2015
34Banten Serang power stationJawaCoal660 MWOperating2017
35PLN Paiton Baru power stationJawaCoal660 MWOperating2012
36Pacitan power stationJawaCoal630 MWOperating2011
37Rembang power stationJawaCoal630 MWOperating2011
38Banten Labuan power stationJawaCoal600 MWOperating2009
39Jambi-1 power stationSumateraCoal600 MWPre-construction2030
40Jambi-2 power stationSumateraCoal600 MWPre-construction2032
41Delong Nickel Phase I power stationSulawesiCoal530 MWOperating2018
42Punagaya power stationSulawesiCoal520 MWOperating2011
43Asam-Asam power stationKalimantanCoal460 MWOperating2000
44Celukan Bawang power stationNusa TenggaraCoal426 MWOperating2015
45Madura PTBA power stationJawaCoal365 MWAnnounced2028
46PT IHIP power stationSulawesiCoal350 MWOperating2024
47Delong Nickel Phase IV power stationSulawesiCoal330 MWOperating2024
48Asahimas Chemical power stationJawaCoal300 MWOperating2019
49Shenhua Guohua power stationSumateraCoal300 MWOperating2013
50Sumbagsel-1 power stationSumateraCoal300 MWConstruction2026