Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.26 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: unknown.
Ownership: PT PLN (Persero).
Its 4 operating units were commissioned between 2011 and 2024.
Why it matters
- The 14th-largest coal-fired power station in Indonesia by capacity (of 98 operating coal facilities tracked).
- Provides about 2.1% of Indonesia's operating coal capacity and roughly 1.3% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.5 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Indonesia
Indonesia has 60.6 GW of operating coal capacity across 98 plants in the Global Energy Monitor dataset — 63% of the country's total operating power capacity of 96.5 GW.
The coal pipeline in Indonesia includes 5.28 GW under construction and 10.4 GW at earlier planning stages.
Other major coal plants in Indonesia include Banten Suralaya power station (6.03 GW), Tanjung Jati B power station (4.64 GW) and Weda Bay power station (4.54 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 315 MW | subcritical | 2011 | ||
| Unit 2 | 315 MW | subcritical | 2012 | ||
| Unit 3 | 315 MW | subcritical | 2012 | ||
| Unit 4 | 315 MW | ultra-supercritical | 2024 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Banten Lontar power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Banten Lontar power station is located in Jawa, Indonesia, at approximately -6.0589, 106.4643. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Banten Lontar power station is owned by PT PLN (Persero). Across the dataset, PT PLN (Persero) is linked to 174 power plants with 43.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Banten Lontar power station?
Banten Lontar power station has a capacity of 1.26 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Banten Lontar power station?
Banten Lontar power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Banten Lontar power station?
Banten Lontar power station is owned by PT PLN (Persero).
Where is Banten Lontar power station located?
It is located in Jawa, Indonesia. Approximate coordinates: -6.0589, 106.4643.
Is Banten Lontar power station operational?
According to the latest data, Banten Lontar power station is in operation. Operating means the facility is built and in commercial service.
When did Banten Lontar power station start operating?
Start year: 2011. Current status: Operating. Its 4 operating units were commissioned between 2011 and 2024.
How much electricity does Banten Lontar power station generate?
Actual output data are not published for every plant. As an indicative estimate, Banten Lontar power station would produce about 5.5 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Banten Lontar power station compared with other facilities in Indonesia?
Banten Lontar power station ranks #14 by capacity among 98 comparable coal facilities tracked in Indonesia.