Overview
Global Energy Monitor tracks 10 units or phases at this site (operating 6.03 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: subbituminous.
Ownership: PT Indonesia Power Suralaya (parent company: PT PLN (Persero)).
Its 10 operating units were commissioned between 1984 and 2025.
Why it matters
- The largest coal-fired power station in Indonesia by capacity, out of 98 operating coal facilities tracked in the country.
- Provides about 9.9% of Indonesia's operating coal capacity and roughly 6.2% of all operating power capacity in the country in the dataset.
- Ranks #6 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 26 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Indonesia
Indonesia has 60.6 GW of operating coal capacity across 98 plants in the Global Energy Monitor dataset — 63% of the country's total operating power capacity of 96.5 GW.
The coal pipeline in Indonesia includes 5.28 GW under construction and 10.4 GW at earlier planning stages.
Other major coal plants in Indonesia include Tanjung Jati B power station (4.64 GW), Weda Bay power station (4.54 GW) and Sulawesi Labota power station (3.36 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 400 MW | subcritical | 1984 | ||
| Phase I Unit 2 | 400 MW | subcritical | 1985 | ||
| Phase I Unit 3 | 400 MW | subcritical | 1988 | ||
| Phase I Unit 4 | 400 MW | subcritical | 1989 | ||
| Phase II Unit 1 | 600 MW | subcritical | 1996 | ||
| Phase II Unit 2 | 600 MW | subcritical | 1997 | ||
| Phase II Unit 3 | 600 MW | subcritical | 1997 | ||
| Unit 08 | 625 MW | subcritical | 2011 | ||
| Unit 09 | 1.00 GW | ultra-supercritical | 2025 | ||
| Unit 10 | 1.00 GW | ultra-supercritical | 2025 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Banten Suralaya power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Banten Suralaya power station is located in Jawa, Indonesia, at approximately -5.8892, 106.0336. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Banten Suralaya power station is owned by PT Indonesia Power Suralaya. The ultimate parent company is PT PLN (Persero). Across the dataset, PT PLN (Persero) is linked to 174 power plants with 43.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Banten Suralaya power station?
Banten Suralaya power station has a capacity of 6.03 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.
What type of facility is Banten Suralaya power station?
Banten Suralaya power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Banten Suralaya power station?
Banten Suralaya power station is owned by PT Indonesia Power Suralaya. The ultimate parent company is PT PLN (Persero).
Where is Banten Suralaya power station located?
It is located in Jawa, Indonesia. Approximate coordinates: -5.8892, 106.0336.
Is Banten Suralaya power station operational?
According to the latest data, Banten Suralaya power station is in operation. Operating means the facility is built and in commercial service.
When did Banten Suralaya power station start operating?
Start year: 1984. Current status: Operating. Its 10 operating units were commissioned between 1984 and 2025.
How much electricity does Banten Suralaya power station generate?
Actual output data are not published for every plant. As an indicative estimate, Banten Suralaya power station would produce about 26 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Banten Suralaya power station compared with other facilities in Indonesia?
Banten Suralaya power station ranks #1 by capacity among 98 comparable coal facilities tracked in Indonesia.