Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 2.11 GW).
Technology: combined cycle, steam turbine; fuel: natural gas, fossil liquids: fuel oil, natural gas, fuel oil.
Ownership: PT PLN Indonesia Power (parent company: PT PLN (Persero)).
Its 6 operating units were commissioned between 1978 and 2024.
Why it matters
- The 5th-largest oil- and gas-fired power station in Indonesia by capacity (of 59 operating oil & gas facilities tracked).
- Provides about 8.1% of Indonesia's operating oil & gas capacity and roughly 2.2% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 7.4 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Indonesia
Indonesia has 26.0 GW of operating oil & gas capacity across 59 plants in the Global Energy Monitor dataset — 27% of the country's total operating power capacity of 96.5 GW.
The oil & gas pipeline in Indonesia includes 960 MW under construction and 13.7 GW at earlier planning stages.
Other major oil & gas plants in Indonesia include Tanjung Priok power station (2.82 GW), Muara Tawar power station (2.79 GW) and Gresik power station (2.18 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC1 | 517 MW | combined cycle | 1993 | ||
| CC2 | 517 MW | combined cycle | 1997 | ||
| CC3 | 780 MW | combined cycle | 2024 | ||
| ST1 | 50 MW | steam turbine | 1978 | ||
| ST2 | 50 MW | steam turbine | 1978 | ||
| ST3 | 200 MW | steam turbine | 1983 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Tambak Lorok power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Tambak Lorok power station is located in Jawa, Indonesia, at approximately -6.9505, 110.4340. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tambak Lorok power station is owned by PT PLN Indonesia Power. The ultimate parent company is PT PLN (Persero). Across the dataset, PT PLN (Persero) is linked to 174 power plants with 43.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Tambak Lorok power station?
Tambak Lorok power station has a capacity of 2.11 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Tambak Lorok power station?
Tambak Lorok power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Tambak Lorok power station?
Tambak Lorok power station is owned by PT PLN Indonesia Power. The ultimate parent company is PT PLN (Persero).
Where is Tambak Lorok power station located?
It is located in Jawa, Indonesia. Approximate coordinates: -6.9505, 110.4340.
Is Tambak Lorok power station operational?
According to the latest data, Tambak Lorok power station is in operation. Operating means the facility is built and in commercial service.
When did Tambak Lorok power station start operating?
Start year: 1978. Current status: Operating. Its 6 operating units were commissioned between 1978 and 2024.
How much electricity does Tambak Lorok power station generate?
Actual output data are not published for every plant. As an indicative estimate, Tambak Lorok power station would produce about 7.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Tambak Lorok power station compared with other facilities in Indonesia?
Tambak Lorok power station ranks #5 by capacity among 59 comparable oil & gas facilities tracked in Indonesia.