Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 1.32 GW).
Technology: subcritical; fuel: coal: subbituminous.
Ownership: PT Jawa Power (parent company: Siemens AG; Marubeni Corp; YTL Corporation Bhd; PT Bumipertiwi Tatapradipta).
Why it matters
- The 12th-largest coal-fired power station in Indonesia by capacity (of 98 operating coal facilities tracked).
- Provides about 2.2% of Indonesia's operating coal capacity and roughly 1.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Indonesia
Indonesia has 60.6 GW of operating coal capacity across 98 plants in the Global Energy Monitor dataset — 63% of the country's total operating power capacity of 96.5 GW.
The coal pipeline in Indonesia includes 5.28 GW under construction and 10.4 GW at earlier planning stages.
Other major coal plants in Indonesia include Banten Suralaya power station (6.03 GW), Tanjung Jati B power station (4.64 GW) and Weda Bay power station (4.54 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 660 MW | subcritical | 2000 | ||
| Unit 2 | 660 MW | subcritical | 2000 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Paiton-2 power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Paiton-2 power station is located in Jawa, Indonesia, at approximately -7.7153, 113.5857. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Paiton-2 power station is owned by PT Jawa Power. The ultimate parent company is Siemens AG; Marubeni Corp; YTL Corporation Bhd; PT Bumipertiwi Tatapradipta. Across the dataset, Siemens AG is linked to 10 power plants in 10 countries, with 3.87 GW of operating capacity.
Frequently asked questions
What is the capacity of Paiton-2 power station?
Paiton-2 power station has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Paiton-2 power station?
Paiton-2 power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Paiton-2 power station?
Paiton-2 power station is owned by PT Jawa Power. The ultimate parent company is Siemens AG; Marubeni Corp; YTL Corporation Bhd; PT Bumipertiwi Tatapradipta.
Where is Paiton-2 power station located?
It is located in Jawa, Indonesia. Approximate coordinates: -7.7153, 113.5857.
Is Paiton-2 power station operational?
According to the latest data, Paiton-2 power station is in operation. Operating means the facility is built and in commercial service.
When did Paiton-2 power station start operating?
Start year: 2000. Current status: Operating.
How much electricity does Paiton-2 power station generate?
Actual output data are not published for every plant. As an indicative estimate, Paiton-2 power station would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Paiton-2 power station compared with other facilities in Indonesia?
Paiton-2 power station ranks #12 by capacity among 98 comparable coal facilities tracked in Indonesia.