Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.32 GW).
Technology: supercritical, unknown; fuel: coal: unknown.
Ownership: PT Huadian Bukit Asam Power (parent company: China Huadian Corp Ltd; PT Bukit Asam Tbk).
Why it matters
- The 12th-largest coal-fired power station in Indonesia by capacity (of 98 operating coal facilities tracked).
- Provides about 2.2% of Indonesia's operating coal capacity and roughly 1.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Indonesia
Indonesia has 60.6 GW of operating coal capacity across 98 plants in the Global Energy Monitor dataset — 63% of the country's total operating power capacity of 96.5 GW.
The coal pipeline in Indonesia includes 5.28 GW under construction and 10.4 GW at earlier planning stages.
Other major coal plants in Indonesia include Banten Suralaya power station (6.03 GW), Tanjung Jati B power station (4.64 GW) and Weda Bay power station (4.54 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 660 MW | supercritical | 2023 | ||
| Unit 2 | 660 MW | supercritical | 2023 | ||
| Unit 3 | 660 MW | Cancelled | unknown | ||
| Unit 4 | 660 MW | Cancelled | unknown |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Bangko Tengah power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Location
Bangko Tengah power station is located in Sumatera, Indonesia, at approximately -3.7340, 103.7590. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Bangko Tengah power station is owned by PT Huadian Bukit Asam Power. The ultimate parent company is China Huadian Corp Ltd; PT Bukit Asam Tbk. Across the dataset, China Huadian Corp Ltd is linked to 156 power plants in 4 countries, with 78.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Bangko Tengah power station?
Bangko Tengah power station has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Bangko Tengah power station?
Bangko Tengah power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Bangko Tengah power station?
Bangko Tengah power station is owned by PT Huadian Bukit Asam Power. The ultimate parent company is China Huadian Corp Ltd; PT Bukit Asam Tbk.
Where is Bangko Tengah power station located?
It is located in Sumatera, Indonesia. Approximate coordinates: -3.7340, 103.7590.
Is Bangko Tengah power station operational?
According to the latest data, Bangko Tengah power station is in operation. Operating means the facility is built and in commercial service.
When did Bangko Tengah power station start operating?
Start year: 2023. Current status: Operating.
How much electricity does Bangko Tengah power station generate?
Actual output data are not published for every plant. As an indicative estimate, Bangko Tengah power station would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Bangko Tengah power station compared with other facilities in Indonesia?
Bangko Tengah power station ranks #12 by capacity among 98 comparable coal facilities tracked in Indonesia.