Overview
Global Energy Monitor tracks 12 units or phases at this site (operating 1.63 GW, under construction 760 MW).
Technology: unknown; fuel: coal: unknown.
Ownership: PT Halmahera Persada Lygend (parent company: Lygend Resources & Technology Co Ltd; PT Trimegah Bangun Persada Tbk).
Its 10 operating units were commissioned between 2020 and 2025.
Why it matters
- The 10th-largest coal-fired power station in Indonesia by capacity (of 98 operating coal facilities tracked).
- Provides about 2.7% of Indonesia's operating coal capacity and roughly 1.7% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 7.1 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Indonesia
Indonesia has 60.6 GW of operating coal capacity across 98 plants in the Global Energy Monitor dataset — 63% of the country's total operating power capacity of 96.5 GW.
The coal pipeline in Indonesia includes 5.28 GW under construction and 10.4 GW at earlier planning stages.
Other major coal plants in Indonesia include Banten Suralaya power station (6.03 GW), Tanjung Jati B power station (4.64 GW) and Weda Bay power station (4.54 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 30 MW | unknown | 2020 | ||
| Phase I Unit 2 | 30 MW | unknown | 2021 | ||
| Phase I Unit 3 | 60 MW | unknown | 2023 | ||
| Phase II Unit 1 | 150 MW | unknown | 2023 | ||
| Phase II Unit 2 | 150 MW | unknown | 2022 | ||
| Phase II Unit 3 | 150 MW | unknown | 2023 | ||
| Phase II Unit 4 | 150 MW | unknown | 2023 | ||
| Phase II Unit 5 | 150 MW | unknown | 2023 | ||
| Phase III Unit 1 | 380 MW | unknown | 2024 | ||
| Phase III Unit 2 | 380 MW | unknown | 2025 | ||
| Phase III Unit 3 | 380 MW | Construction | unknown | ||
| Phase III Unit 4 | 380 MW | Construction | unknown |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Location
PT Halmahera Persada Lygend Nickel Smelter power station is located in Maluku, Indonesia, at approximately -1.5614, 127.4210. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
PT Halmahera Persada Lygend Nickel Smelter power station is owned by PT Halmahera Persada Lygend. The ultimate parent company is Lygend Resources & Technology Co Ltd; PT Trimegah Bangun Persada Tbk.
Frequently asked questions
What is the capacity of PT Halmahera Persada Lygend Nickel Smelter power station?
PT Halmahera Persada Lygend Nickel Smelter power station has a capacity of 1.63 GW according to the latest Global Energy Monitor data. This figure covers the 12 units or phases listed for the site.
What type of facility is PT Halmahera Persada Lygend Nickel Smelter power station?
PT Halmahera Persada Lygend Nickel Smelter power station is a coal-fired power station.
Who owns PT Halmahera Persada Lygend Nickel Smelter power station?
PT Halmahera Persada Lygend Nickel Smelter power station is owned by PT Halmahera Persada Lygend. The ultimate parent company is Lygend Resources & Technology Co Ltd; PT Trimegah Bangun Persada Tbk.
Where is PT Halmahera Persada Lygend Nickel Smelter power station located?
It is located in Maluku, Indonesia. Approximate coordinates: -1.5614, 127.4210.
Is PT Halmahera Persada Lygend Nickel Smelter power station operational?
According to the latest data, PT Halmahera Persada Lygend Nickel Smelter power station is in operation. Operating means the facility is built and in commercial service.
When did PT Halmahera Persada Lygend Nickel Smelter power station start operating?
Start year: 2020. Current status: Operating. Its 10 operating units were commissioned between 2020 and 2025.
How much electricity does PT Halmahera Persada Lygend Nickel Smelter power station generate?
Actual output data are not published for every plant. As an indicative estimate, PT Halmahera Persada Lygend Nickel Smelter power station would produce about 7.1 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is PT Halmahera Persada Lygend Nickel Smelter power station compared with other facilities in Indonesia?
PT Halmahera Persada Lygend Nickel Smelter power station ranks #10 by capacity among 98 comparable coal facilities tracked in Indonesia.