Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 2.00 GW, planned 2.40 GW).
Technology: pressurized water reactor.
Ownership: CEZ AS.
Its 4 operating units were commissioned between 1985 and 1987. 2 further units or phases are scheduled to come online in 2036. 4 operating units have a planned retirement date, the earliest in 2037.
Why it matters
- The 2nd-largest nuclear power plant in Czech Republic by capacity (of 2 operating nuclear facilities tracked).
- Provides about 48% of Czech Republic's operating nuclear capacity and roughly 11% of all operating power capacity in the country in the dataset.
- Ranks #90 worldwide among nuclear facilities of the same status group by capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 15 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Czech Republic
Czech Republic has 4.16 GW of operating nuclear capacity across 2 plants in the Global Energy Monitor dataset — 23% of the country's total operating power capacity of 17.8 GW.
The nuclear pipeline in Czech Republic includes 1.07 GW at earlier planning stages.
Other major nuclear plants in Czech Republic include Temelin nuclear power plant (2.16 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 500 MW | pressurized water reactor | 1985 | 2037 | |
| 2 | 500 MW | pressurized water reactor | 1986 | 2037 | |
| 3 | 500 MW | pressurized water reactor | 1986 | 2037 | |
| 4 | 500 MW | pressurized water reactor | 1987 | 2037 | |
| 5 | 1.20 GW | Pre-construction | pressurized water reactor | 2036 | |
| 6 | 1.20 GW | Pre-construction | pressurized water reactor | 2036 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Dukovany nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Location
Dukovany nuclear power plant is located in Kraj Vysočina, Czech Republic, at approximately 49.0852, 16.1479. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Dukovany nuclear power plant is owned by CEZ AS. Across the dataset, CEZ AS is linked to 18 power plants in 3 countries, with 7.42 GW of operating capacity.
Frequently asked questions
What is the capacity of Dukovany nuclear power plant?
Dukovany nuclear power plant has a capacity of 2.00 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Dukovany nuclear power plant?
Dukovany nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Dukovany nuclear power plant?
Dukovany nuclear power plant is owned by CEZ AS.
Where is Dukovany nuclear power plant located?
It is located in Kraj Vysočina, Czech Republic. Approximate coordinates: 49.0852, 16.1479.
Is Dukovany nuclear power plant operational?
According to the latest data, Dukovany nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Dukovany nuclear power plant start operating?
Start year: 1985. Current status: Operating. Its 4 operating units were commissioned between 1985 and 1987. 2 further units or phases are scheduled to come online in 2036. 4 operating units have a planned retirement date, the earliest in 2037.
How much electricity does Dukovany nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Dukovany nuclear power plant would produce about 15 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Dukovany nuclear power plant compared with other facilities in Czech Republic?
Dukovany nuclear power plant ranks #2 by capacity among 2 comparable nuclear facilities tracked in Czech Republic.
Latest news on Dukovany nuclear power plant
Belgium Pushes Nuclear Takeover Deadline to December 12 Amid Valuation Dispute
Doosan Enerbility to Build Reactor Vessel for NuScale’s Flagship US Small Modular Reactor
KHNP Ends Daewoo-Doosan Talks on $18.6B Czech Nuclear Project
Slovakia Buys Out Czech Stake in JESS, Clearing Path for New Bohunice Reactor
South Korea Pledges $120 Billion for Eight US Nuclear Reactors