Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 2.16 GW, planned 2.70 GW).
Technology: pressurized water reactor, small modular reactor.
Ownership: CEZ AS.
Its 2 operating units were commissioned between 2002 and 2003. 1 further units or phases are scheduled to come online in 2035.
Why it matters
- The largest nuclear power plant in Czech Republic by capacity, out of 2 operating nuclear facilities tracked in the country.
- Provides about 52% of Czech Republic's operating nuclear capacity and roughly 12% of all operating power capacity in the country in the dataset.
- Ranks #79 worldwide among nuclear facilities of the same status group by capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 16 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Czech Republic
Czech Republic has 4.16 GW of operating nuclear capacity across 2 plants in the Global Energy Monitor dataset — 23% of the country's total operating power capacity of 17.8 GW.
The nuclear pipeline in Czech Republic includes 1.07 GW at earlier planning stages.
Other major nuclear plants in Czech Republic include Dukovany nuclear power plant (2.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 1.08 GW | pressurized water reactor | 2002 | ||
| 2 | 1.08 GW | pressurized water reactor | 2003 | ||
| 3 | 1.20 GW | Announced | pressurized water reactor | ||
| 4 | 1.20 GW | Announced | pressurized water reactor | ||
| Original 3 | 1.00 GW | Cancelled | pressurized water reactor | ||
| Original 4 | 1.00 GW | Cancelled | pressurized water reactor | ||
| SMR | 300 MW | Announced | small modular reactor | 2035 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Temelin nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Location
Temelin nuclear power plant is located in Jihočeský, Czech Republic, at approximately 49.1796, 14.3795. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Temelin nuclear power plant is owned by CEZ AS. Across the dataset, CEZ AS is linked to 18 power plants in 3 countries, with 7.42 GW of operating capacity.
Frequently asked questions
What is the capacity of Temelin nuclear power plant?
Temelin nuclear power plant has a capacity of 2.16 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Temelin nuclear power plant?
Temelin nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Temelin nuclear power plant?
Temelin nuclear power plant is owned by CEZ AS.
Where is Temelin nuclear power plant located?
It is located in Jihočeský, Czech Republic. Approximate coordinates: 49.1796, 14.3795.
Is Temelin nuclear power plant operational?
According to the latest data, Temelin nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Temelin nuclear power plant start operating?
Start year: 2002. Current status: Operating. Its 2 operating units were commissioned between 2002 and 2003. 1 further units or phases are scheduled to come online in 2035.
How much electricity does Temelin nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Temelin nuclear power plant would produce about 16 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Temelin nuclear power plant compared with other facilities in Czech Republic?
Temelin nuclear power plant ranks #1 by capacity among 2 comparable nuclear facilities tracked in Czech Republic.
Latest news on Temelin nuclear power plant
Akkuyu Completes Turbine Foundation for Fourth and Final Reactor Unit
KHNP Ends Daewoo-Doosan Talks on $18.6B Czech Nuclear Project
energyRe, Güney Karolina’daki Beş Güneş Enerjisi Projesi İçin 815 Milyon Dolarlık Finansmanı Tamamladı
Why Is Rolls-Royce Building SMRs?
Slovakia Buys Out Czech Stake in JESS, Clearing Path for New Bohunice Reactor