Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 1.85 GW, planned 1.00 GW).
Technology: combined cycle, subcritical; fuel: natural gas, coal: lignite.
Ownership: Sev.en Energy AG.
Its 6 operating units were commissioned between 1970 and 2014. 2 further units or phases are scheduled to come online in 2031–2032. 5 operating units have a planned retirement date, the earliest in 2027.
Why it matters
- The largest oil- and gas-fired power station in Czech Republic by capacity, out of 13 operating oil & gas facilities tracked in the country.
- Provides about 51% of Czech Republic's operating oil & gas capacity and roughly 10% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 6.5 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Czech Republic
Czech Republic has 3.64 GW of operating oil & gas capacity across 13 plants in the Global Energy Monitor dataset — 20% of the country's total operating power capacity of 17.8 GW.
The oil & gas pipeline in Czech Republic includes 462 MW at earlier planning stages.
See the full list: Gas & oil power plants in Czech Republic →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CCGT2 | 250 MW | Announced | combined cycle | 2031 | |
| CCGT3 | 750 MW | Announced | combined cycle | 2032 | |
| GT1 | 847 MW | combined cycle | 2014 | ||
| Phase 1 Unit 2 | 200 MW | subcritical | 1970 | 2027 | |
| Phase 1 Unit 3 | 200 MW | subcritical | 1971 | 2027 | |
| Phase 1 Unit 4 | 200 MW | subcritical | 1971 | 2027 | |
| Phase 2 Unit 1 | 200 MW | subcritical | 1977 | 2027 | |
| Phase 2 Unit 2 | 200 MW | subcritical | 1977 | 2027 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Pocerady power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Pocerady power station is located in Ústecký, Czech Republic, at approximately 50.4267, 13.6747. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Pocerady power station is owned by Sev.en Energy AG. Across the dataset, Sev.en Energy AG is linked to 4 power plants with 3.15 GW of operating capacity.
Frequently asked questions
What is the capacity of Pocerady power station?
Pocerady power station has a capacity of 1.85 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Pocerady power station?
Pocerady power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Pocerady power station?
Pocerady power station is owned by Sev.en Energy AG.
Where is Pocerady power station located?
It is located in Ústecký, Czech Republic. Approximate coordinates: 50.4267, 13.6747.
Is Pocerady power station operational?
According to the latest data, Pocerady power station is in operation. Operating means the facility is built and in commercial service.
When did Pocerady power station start operating?
Start year: 1970. Current status: Operating. Its 6 operating units were commissioned between 1970 and 2014. 2 further units or phases are scheduled to come online in 2031–2032. 5 operating units have a planned retirement date, the earliest in 2027.
How much electricity does Pocerady power station generate?
Actual output data are not published for every plant. As an indicative estimate, Pocerady power station would produce about 6.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Pocerady power station compared with other facilities in Czech Republic?
Pocerady power station ranks #1 by capacity among 13 comparable oil & gas facilities tracked in Czech Republic.