Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 2.58 GW).
Technology: subcritical, supercritical, ultra-supercritical; fuel: coal: lignite.
Ownership: Lausitz Energie Kraftwerke AG (parent company: unknown; EP Investment S.à r.l.; Tiliacordata Ltd).
Its 4 operating units were commissioned between 1979 and 2012. 4 operating units have a planned retirement date, the earliest in 2029.
Why it matters
- The largest coal-fired power station in Germany by capacity, out of 38 operating coal facilities tracked in the country.
- Provides about 10% of Germany's operating coal capacity and roughly 1.6% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 11 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Germany
Germany has 25.9 GW of operating coal capacity across 38 plants in the Global Energy Monitor dataset — 16% of the country's total operating power capacity of 161.9 GW.
Other major coal plants in Germany include Niederaussem power station (2.28 GW), Neurath power station (2.20 GW) and GKM (Mannheim) power station (2.15 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit N | 500 MW | subcritical | 1979 | 2029 | |
| Unit P | 500 MW | subcritical | 1980 | 2029 | |
| Unit Q | 907 MW | supercritical | 2000 | 2038 | |
| Unit R | 675 MW | ultra-supercritical | 2012 | 2038 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Boxberg power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Boxberg power station is located in Sachsen, Germany, at approximately 51.4197, 14.5753. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Boxberg power station is owned by Lausitz Energie Kraftwerke AG. The ultimate parent company is unknown; EP Investment S.à r.l.; Tiliacordata Ltd. Across the dataset, unknown is linked to 1,341 power plants in 80 countries, with 608.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Boxberg power station?
Boxberg power station has a capacity of 2.58 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Boxberg power station?
Boxberg power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Boxberg power station?
Boxberg power station is owned by Lausitz Energie Kraftwerke AG. The ultimate parent company is unknown; EP Investment S.à r.l.; Tiliacordata Ltd.
Where is Boxberg power station located?
It is located in Sachsen, Germany. Approximate coordinates: 51.4197, 14.5753.
Is Boxberg power station operational?
According to the latest data, Boxberg power station is in operation. Operating means the facility is built and in commercial service.
When did Boxberg power station start operating?
Start year: 1979. Current status: Operating. Its 4 operating units were commissioned between 1979 and 2012. 4 operating units have a planned retirement date, the earliest in 2029.
How much electricity does Boxberg power station generate?
Actual output data are not published for every plant. As an indicative estimate, Boxberg power station would produce about 11 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Boxberg power station compared with other facilities in Germany?
Boxberg power station ranks #1 by capacity among 38 comparable coal facilities tracked in Germany.