Global Energy Monitor tracks 10 units or phases at this site (operating 6.03 GW, under construction 1.00 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: bituminous, coal: unknown.
Ownership: Zhejiang Zheneng Jiahua Power Generator Co Ltd (parent company: Zhejiang Zheneng Electric Power Co Ltd; GD POWER Development Co Ltd; China Shenhua Energy Co Ltd; unknown).
Its 9 operating units were commissioned between 1995 and 2025.
Why it matters
- The 4th-largest coal-fired power station in China by capacity (of 1188 operating coal facilities tracked).
- Ranks #5 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 26 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 330 MW | subcritical | 1995 | ||
| Phase I Unit 2 | 300 MW | subcritical | 1995 | ||
| Phase II Unit 3 | 600 MW | subcritical | 2004 | ||
| Phase II Unit 4 | 600 MW | subcritical | 2004 | ||
| Phase II Unit 5 | 600 MW | subcritical | 2005 | ||
| Phase II Unit 6 | 600 MW | subcritical | 2005 | ||
| Phase III Unit 7 | 1.00 GW | ultra-supercritical | 2011 | ||
| Phase III Unit 8 | 1.00 GW | ultra-supercritical | 2011 | ||
| Phase IV Unit 9 | 1.00 GW | ultra-supercritical | 2025 | ||
| Phase IV Unit 10 | 1.00 GW | Construction | ultra-supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Jiaxing power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Jiaxing power station is located in Zhejiang, China, at approximately 30.6280, 121.1442. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Jiaxing power station is owned by Zhejiang Zheneng Jiahua Power Generator Co Ltd. The ultimate parent company is Zhejiang Zheneng Electric Power Co Ltd; GD POWER Development Co Ltd; China Shenhua Energy Co Ltd; unknown. Across the dataset, Zhejiang Zheneng Electric Power Co Ltd is linked to 40 power plants with 70.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Jiaxing power station?
Jiaxing power station has a capacity of 6.03 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.
What type of facility is Jiaxing power station?
Jiaxing power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Jiaxing power station?
Jiaxing power station is owned by Zhejiang Zheneng Jiahua Power Generator Co Ltd. The ultimate parent company is Zhejiang Zheneng Electric Power Co Ltd; GD POWER Development Co Ltd; China Shenhua Energy Co Ltd; unknown.
Where is Jiaxing power station located?
It is located in Zhejiang, China. Approximate coordinates: 30.6280, 121.1442.
Is Jiaxing power station operational?
According to the latest data, Jiaxing power station is in operation. Operating means the facility is built and in commercial service.
When did Jiaxing power station start operating?
Start year: 1995. Current status: Operating. Its 9 operating units were commissioned between 1995 and 2025.
How much electricity does Jiaxing power station generate?
Actual output data are not published for every plant. As an indicative estimate, Jiaxing power station would produce about 26 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Jiaxing power station compared with other facilities in China?
Jiaxing power station ranks #4 by capacity among 1188 comparable coal facilities tracked in China.