Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 2.20 GW, retired 2.22 GW).
Technology: unknown, ultra-supercritical; fuel: coal: lignite.
Ownership: RWE Power AG (parent company: RWE AG).
5 units have already been retired (2021–2024). 2 operating units have a planned retirement date, the earliest in 2033.
Why it matters
- The 3rd-largest coal-fired power station in Germany by capacity (of 38 operating coal facilities tracked).
- Provides about 8.5% of Germany's operating coal capacity and roughly 1.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 9.6 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Germany
Germany has 25.9 GW of operating coal capacity across 38 plants in the Global Energy Monitor dataset — 16% of the country's total operating power capacity of 161.9 GW.
Other major coal plants in Germany include Boxberg power station (2.58 GW), Niederaussem power station (2.28 GW) and GKM (Mannheim) power station (2.15 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit A | 312 MW | Retired | unknown | 1972 | 2022 |
| Unit B | 312 MW | Retired | unknown | 1972 | 2021 |
| Unit C | 312 MW | Retired | unknown | 1973 | 2024 |
| Unit D | 644 MW | Retired | unknown | 1975 | 2024 |
| Unit E | 644 MW | Retired | unknown | 1976 | 2024 |
| Unit F | 1.10 GW | ultra-supercritical | 2012 | 2033 | |
| Unit G | 1.10 GW | ultra-supercritical | 2012 | 2033 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Neurath power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Location
Neurath power station is located in Nordrhein-Westfalen, Germany, at approximately 51.0358, 6.6330. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Neurath power station is owned by RWE Power AG. The ultimate parent company is RWE AG. Across the dataset, RWE AG is linked to 197 power plants in 15 countries, with 33.6 GW of operating capacity.
Frequently asked questions
What is the capacity of Neurath power station?
Neurath power station has a capacity of 2.20 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Neurath power station?
Neurath power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Neurath power station?
Neurath power station is owned by RWE Power AG. The ultimate parent company is RWE AG.
Where is Neurath power station located?
It is located in Nordrhein-Westfalen, Germany. Approximate coordinates: 51.0358, 6.6330.
Is Neurath power station operational?
According to the latest data, Neurath power station is in operation. Operating means the facility is built and in commercial service.
When did Neurath power station start operating?
Start year: 2012. Current status: Operating. 5 units have already been retired (2021–2024). 2 operating units have a planned retirement date, the earliest in 2033.
How much electricity does Neurath power station generate?
Actual output data are not published for every plant. As an indicative estimate, Neurath power station would produce about 9.6 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Neurath power station compared with other facilities in Germany?
Neurath power station ranks #3 by capacity among 38 comparable coal facilities tracked in Germany.