Coal · Germany

Herne power station

Herne power station is a 1.23 GW coal-fired power station located in Nordrhein-Westfalen, Germany. The facility is currently in operation, with its first unit entering service in 1989.

1.23 GWCapacity
OperatingStatus
1989Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (operating 1.23 GW, retired 600 MW).

Technology: subcritical, supercritical, ultra-supercritical, combined cycle; fuel: coal: bituminous, natural gas.

Ownership: STEAG GmbH (parent company: Asterion Industrial Partners SGEIC SA).

Its 2 operating units were commissioned between 1989 and 2022. 3 units have already been retired (2013–2017). 1 operating units have a planned retirement date, the earliest in 2031.

Why it matters

  • The 8th-largest coal-fired power station in Germany by capacity (of 38 operating coal facilities tracked).
  • Provides about 4.7% of Germany's operating coal capacity and roughly 0.8% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 50% for this technology, it would generate roughly 5.4 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in Germany

Germany has 25.9 GW of operating coal capacity across 38 plants in the Global Energy Monitor dataset — 16% of the country's total operating power capacity of 161.9 GW.

Other major coal plants in Germany include Boxberg power station (2.58 GW), Niederaussem power station (2.28 GW) and Neurath power station (2.20 GW).

See the full list: Coal power plants in Germany →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 145 MW Retired subcritical 1962 2014
Unit 2 145 MW Retired subcritical 1963 2013
Unit 3 310 MW Retired subcritical 1966 2017
Unit 4 500 MW Operating supercritical 1989 2031
Unit 5 750 MW Cancelled ultra-supercritical
Unit 6, timepoint 1 725 MW Operating combined cycle 2022

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Herne power station

Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Herne power station is located in Nordrhein-Westfalen, Germany, at approximately 51.5514, 7.1889. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Herne power station is owned by STEAG GmbH. The ultimate parent company is Asterion Industrial Partners SGEIC SA. Across the dataset, Asterion Industrial Partners SGEIC SA is linked to 12 power plants in 2 countries, with 3.29 GW of operating capacity.

Frequently asked questions

What is the capacity of Herne power station?

Herne power station has a capacity of 1.23 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is Herne power station?

Herne power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Who owns Herne power station?

Herne power station is owned by STEAG GmbH. The ultimate parent company is Asterion Industrial Partners SGEIC SA.

Where is Herne power station located?

It is located in Nordrhein-Westfalen, Germany. Approximate coordinates: 51.5514, 7.1889.

Is Herne power station operational?

According to the latest data, Herne power station is in operation. Operating means the facility is built and in commercial service.

When did Herne power station start operating?

Start year: 1989. Current status: Operating. Its 2 operating units were commissioned between 1989 and 2022. 3 units have already been retired (2013–2017). 1 operating units have a planned retirement date, the earliest in 2031.

How much electricity does Herne power station generate?

Actual output data are not published for every plant. As an indicative estimate, Herne power station would produce about 5.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Herne power station compared with other facilities in Germany?

Herne power station ranks #8 by capacity among 38 comparable coal facilities tracked in Germany.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects