Overview
Global Energy Monitor tracks 11 units or phases at this site (operating 2.00 GW, planned 800 MW, retired 844 MW).
Technology: combined cycle, gas turbine, subcritical; fuel: natural gas, coal: lignite.
Ownership: RWE Power AG (parent company: RWE AG).
Its 5 operating units were commissioned between 1967 and 2006. 1 further units or phases are scheduled to come online in 2030. 5 units have already been retired (2000–2021). 2 operating units have a planned retirement date, the earliest in 2028.
Why it matters
- The largest oil- and gas-fired power station in Germany by capacity, out of 165 operating oil & gas facilities tracked in the country.
- Provides about 5.3% of Germany's operating oil & gas capacity and roughly 1.2% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 7.0 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Germany
Germany has 37.7 GW of operating oil & gas capacity across 165 plants in the Global Energy Monitor dataset — 23% of the country's total operating power capacity of 161.9 GW.
The oil & gas pipeline in Germany includes 31 MW under construction and 5.93 GW at earlier planning stages.
Other major oil & gas plants in Germany include Emsland power station (1.84 GW), Irsching power station (1.73 GW) and Schwarze Pumpe power station (1.60 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC, timepoint 1 | 800 MW | Pre-construction | combined cycle | 2030 | |
| G_VGT | 200 MW | gas turbine | 2006 | ||
| H_VGT | 200 MW | gas turbine | 2006 | ||
| Unit A | 100 MW | Retired | subcritical | 1955 | 2000 |
| Unit B | 100 MW | Retired | subcritical | 1955 | 2000 |
| Unit C | 134 MW | Retired | subcritical | 1955 | 2012 |
| Unit D | 147 MW | Retired | subcritical | 1959 | 2012 |
| Unit E | 363 MW | Retired | subcritical | 1965 | 2021 |
| Unit F | 340 MW | subcritical | 1967 | 2024 | |
| Unit G | 630 MW | subcritical | 1974 | 2028 | |
| Unit H | 625 MW | subcritical | 1975 | 2029 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Weisweiler power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Weisweiler power station is located in Nordrhein-Westfalen, Germany, at approximately 50.8396, 6.3224. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Weisweiler power station is owned by RWE Power AG. The ultimate parent company is RWE AG. Across the dataset, RWE AG is linked to 197 power plants in 15 countries, with 33.6 GW of operating capacity.
Frequently asked questions
What is the capacity of Weisweiler power station?
Weisweiler power station has a capacity of 2.00 GW according to the latest Global Energy Monitor data. This figure covers the 11 units or phases listed for the site.
What type of facility is Weisweiler power station?
Weisweiler power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Weisweiler power station?
Weisweiler power station is owned by RWE Power AG. The ultimate parent company is RWE AG.
Where is Weisweiler power station located?
It is located in Nordrhein-Westfalen, Germany. Approximate coordinates: 50.8396, 6.3224.
Is Weisweiler power station operational?
According to the latest data, Weisweiler power station is in operation. Operating means the facility is built and in commercial service.
When did Weisweiler power station start operating?
Start year: 1967. Current status: Operating. Its 5 operating units were commissioned between 1967 and 2006. 1 further units or phases are scheduled to come online in 2030. 5 units have already been retired (2000–2021). 2 operating units have a planned retirement date, the earliest in 2028.
How much electricity does Weisweiler power station generate?
Actual output data are not published for every plant. As an indicative estimate, Weisweiler power station would produce about 7.0 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Weisweiler power station compared with other facilities in Germany?
Weisweiler power station ranks #1 by capacity among 165 comparable oil & gas facilities tracked in Germany.