Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 1.00 GW, planned 1.20 GW, retired 1.02 GW).
Technology: pressurized water reactor, heavy water gas-cooled reactor.
Ownership: Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC).
1 further units or phases are scheduled to come online in 2040. 3 units have already been retired (1977–2008).
Why it matters
- The 2nd-largest nuclear power plant in Slovakia by capacity (of 2 operating nuclear facilities tracked).
- Provides about 40% of Slovakia's operating nuclear capacity and roughly 15% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 85% for this technology, it would generate roughly 7.4 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Slovakia
Slovakia has 2.47 GW of operating nuclear capacity across 2 plants in the Global Energy Monitor dataset — 36% of the country's total operating power capacity of 6.84 GW.
Other major nuclear plants in Slovakia include Mochovce nuclear power plant (1.47 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 440 MW | Retired | pressurized water reactor | 1980 | 2006 |
| 2 | 440 MW | Retired | pressurized water reactor | 1981 | 2008 |
| 3 | 500 MW | pressurized water reactor | 1985 | ||
| 4 | 500 MW | pressurized water reactor | 1985 | ||
| 5 | 1.20 GW | Pre-construction | pressurized water reactor | 2040 | |
| A1 | 143 MW | Retired | heavy water gas-cooled reactor | 1972 | 1977 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Bohunice nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit. Pressurised heavy water reactors (PHWR), such as the CANDU design, use heavy water as moderator and coolant and can run on natural uranium. Gas-cooled reactors use carbon dioxide or helium as coolant and graphite as moderator.
Location
Bohunice nuclear power plant is located in Trnavský, Slovakia, at approximately 48.4968, 17.6907. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Bohunice nuclear power plant is owned by Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC).
Frequently asked questions
What is the capacity of Bohunice nuclear power plant?
Bohunice nuclear power plant has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Bohunice nuclear power plant?
Bohunice nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Bohunice nuclear power plant?
Bohunice nuclear power plant is owned by Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC).
Where is Bohunice nuclear power plant located?
It is located in Trnavský, Slovakia. Approximate coordinates: 48.4968, 17.6907.
Is Bohunice nuclear power plant operational?
According to the latest data, Bohunice nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Bohunice nuclear power plant start operating?
Start year: 1985. Current status: Operating. 1 further units or phases are scheduled to come online in 2040. 3 units have already been retired (1977–2008).
How much electricity does Bohunice nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Bohunice nuclear power plant would produce about 7.4 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Bohunice nuclear power plant compared with other facilities in Slovakia?
Bohunice nuclear power plant ranks #2 by capacity among 2 comparable nuclear facilities tracked in Slovakia.