Overview
Global Energy Monitor tracks 10 units or phases at this site (operating 3.02 GW, retired 525 MW).
Technology: steam turbine, combined cycle; fuel: LNG.
Ownership: JERA Co Inc (parent company: Chubu Electric Power Co Inc; Tokyo Electric Power Co).
Its 8 operating units were commissioned between 1996 and 1998. 2 units have already been retired (2022).
Why it matters
- The 9th-largest oil- and gas-fired power station in Japan by capacity (of 90 operating oil & gas facilities tracked).
- Provides about 3% of Japan's operating oil & gas capacity and roughly 1.2% of all operating power capacity in the country in the dataset.
- Ranks #51 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 11 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Japan
Japan has 99.2 GW of operating oil & gas capacity across 90 plants in the Global Energy Monitor dataset — 39% of the country's total operating power capacity of 253.7 GW.
The oil & gas pipeline in Japan includes 1.75 GW at earlier planning stages.
Other major oil & gas plants in Japan include Futtsu thermal power station (5.33 GW), Kawagoe thermal power station (4.80 GW) and Chiba thermal power station (4.38 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 5 | 175 MW | Retired | steam turbine | 1964 | 2022 |
| 6 | 350 MW | Retired | steam turbine | 1968 | 2022 |
| 7-1 | 377 MW | combined cycle | 1998 | ||
| 7-2 | 377 MW | combined cycle | 1997 | ||
| 7-3 | 377 MW | combined cycle | 1997 | ||
| 7-4 | 377 MW | combined cycle | 1996 | ||
| 8-1 | 377 MW | combined cycle | 1996 | ||
| 8-2 | 377 MW | combined cycle | 1997 | ||
| 8-3 | 377 MW | combined cycle | 1997 | ||
| 8-4 | 377 MW | combined cycle | 1998 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Yokohama thermal power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Yokohama thermal power station is located in Kanagawa, Japan, at approximately 35.4770, 139.6779. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Yokohama thermal power station is owned by JERA Co Inc. The ultimate parent company is Chubu Electric Power Co Inc; Tokyo Electric Power Co. Across the dataset, Chubu Electric Power Co Inc is linked to 96 power plants in 11 countries, with 86.2 GW of operating capacity.
Frequently asked questions
What is the capacity of Yokohama thermal power station?
Yokohama thermal power station has a capacity of 3.02 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.
What type of facility is Yokohama thermal power station?
Yokohama thermal power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Yokohama thermal power station?
Yokohama thermal power station is owned by JERA Co Inc. The ultimate parent company is Chubu Electric Power Co Inc; Tokyo Electric Power Co.
Where is Yokohama thermal power station located?
It is located in Kanagawa, Japan. Approximate coordinates: 35.4770, 139.6779.
Is Yokohama thermal power station operational?
According to the latest data, Yokohama thermal power station is in operation. Operating means the facility is built and in commercial service.
When did Yokohama thermal power station start operating?
Start year: 1996. Current status: Operating. Its 8 operating units were commissioned between 1996 and 1998. 2 units have already been retired (2022).
How much electricity does Yokohama thermal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Yokohama thermal power station would produce about 11 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Yokohama thermal power station compared with other facilities in Japan?
Yokohama thermal power station ranks #9 by capacity among 90 comparable oil & gas facilities tracked in Japan.