Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 1.22 GW).
Technology: combined cycle; fuel: LNG.
Ownership: Ogishima Power Co Ltd (parent company: Tokyo Gas Co Ltd; Idemitsu Kosan Co Ltd).
Its 3 operating units were commissioned between 2010 and 2016.
Why it matters
- Provides about 1.2% of Japan's operating oil & gas capacity and roughly 0.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.3 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Japan
Japan has 99.2 GW of operating oil & gas capacity across 90 plants in the Global Energy Monitor dataset — 39% of the country's total operating power capacity of 253.7 GW.
The oil & gas pipeline in Japan includes 1.75 GW at earlier planning stages.
Other major oil & gas plants in Japan include Futtsu thermal power station (5.33 GW), Kawagoe thermal power station (4.80 GW) and Chiba thermal power station (4.38 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 407 MW | combined cycle | 2010 | ||
| 2 | 407 MW | combined cycle | 2010 | ||
| 3 | 407 MW | combined cycle | 2016 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Ohgishima power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Ohgishima power station is located in Kanagawa, Japan, at approximately 35.4791, 139.7022. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ohgishima power station is owned by Ogishima Power Co Ltd. The ultimate parent company is Tokyo Gas Co Ltd; Idemitsu Kosan Co Ltd. Across the dataset, Tokyo Gas Co Ltd is linked to 22 power plants in 5 countries, with 4.12 GW of operating capacity.
Frequently asked questions
What is the capacity of Ohgishima power station?
Ohgishima power station has a capacity of 1.22 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Ohgishima power station?
Ohgishima power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Ohgishima power station?
Ohgishima power station is owned by Ogishima Power Co Ltd. The ultimate parent company is Tokyo Gas Co Ltd; Idemitsu Kosan Co Ltd.
Where is Ohgishima power station located?
It is located in Kanagawa, Japan. Approximate coordinates: 35.4791, 139.7022.
Is Ohgishima power station operational?
According to the latest data, Ohgishima power station is in operation. Operating means the facility is built and in commercial service.
When did Ohgishima power station start operating?
Start year: 2010. Current status: Operating. Its 3 operating units were commissioned between 2010 and 2016.
How much electricity does Ohgishima power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ohgishima power station would produce about 4.3 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Ohgishima power station compared with other facilities in Japan?
Ohgishima power station ranks #28 by capacity among 90 comparable oil & gas facilities tracked in Japan.