Overview
The tracker lists 2 trains, units or expansion phases at the terminal.
Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.
One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 8.7 bcm/y of gas.
Ownership: Tokyo Gas Co Ltd.
Its 2 operating units were commissioned between 2016 and 2021.
Why it matters
- The 15th-largest LNG import (regasification) terminal in Japan by capacity (of 45 operating lng import terminal facilities tracked).
- Ranks #69 worldwide among lng import terminal facilities of the same status group by capacity.
Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.
LNG terminals in Japan
The dataset tracks 45 lng terminals in Japan, including operating, planned and shelved projects.
Japan has 242.2 mtpa of operating LNG import capacity across 45 terminals.
Trains and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| — | 3.20 mtpa | 2016 | |||
| Expansion | 3.20 mtpa | 2021 |
How lng terminals work
An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.
Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.
Location
Hitachi LNG Terminal is located in Kanto, Japan, at approximately 36.4843, 140.6189. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Hitachi LNG Terminal is owned by Tokyo Gas Co Ltd. Across the dataset, Tokyo Gas Co Ltd is linked to 10 lng terminals.
Frequently asked questions
What is the capacity of Hitachi LNG Terminal?
Hitachi LNG Terminal has a capacity of 6.40 mtpa according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Hitachi LNG Terminal?
Hitachi LNG Terminal is a LNG import (regasification) terminal.
Who owns Hitachi LNG Terminal?
Hitachi LNG Terminal is owned by Tokyo Gas Co Ltd.
Where is Hitachi LNG Terminal located?
It is located in Kanto, Japan. Approximate coordinates: 36.4843, 140.6189.
Is Hitachi LNG Terminal operational?
According to the latest data, Hitachi LNG Terminal is in operation. Operating means the facility is built and in commercial service.
When did Hitachi LNG Terminal start operating?
Start year: 2016. Current status: Operating. Its 2 operating units were commissioned between 2016 and 2021.
How big is Hitachi LNG Terminal compared with other facilities in Japan?
Hitachi LNG Terminal ranks #15 by capacity among 45 comparable lng import terminal facilities tracked in Japan.
Latest news on Hitachi LNG Terminal
OPG Says Canada’s First Small Modular Reactor Will Miss 2030 Target, Launches Cost Review
What Is a Small Modular Reactor (SMR)?
OPG’s Origin Nuclear to Help Operate SGE’s 14-Unit UK BWRX-300 Fleet
ZE PAK and Synthos Green Energy Form Joint Venture for Six Small Modular Reactors at Poland’s Pątnów Site
Poland Delays First Nuclear Plant to 2036, Sets 2040 for Second