Nuclear · Japan

Tokai nuclear power plant

Tokai nuclear power plant is a 1.10 GW nuclear power plant located in Ibaraki, Japan. The facility is currently under construction, with a targeted start date of 1966.

1.10 GWCapacity (all phases)
ConstructionStatus
1966Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (under construction 1.10 GW, retired 166 MW).

Technology: gas-cooled reactor, boiling water reactor.

Ownership: Japan Atomic Power Co.

1 further units or phases are scheduled to come online in 2026. 1 units have already been retired (1998).

Why it matters

  • The 8th-largest nuclear power plant in Japan by capacity (of 12 operating, under-construction and planned nuclear facilities tracked).
  • If completed, it would add 1.10 GW to Japan's nuclear fleet — equivalent to 7.5% of today's operating nuclear capacity.

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in Japan

Japan has 14.6 GW of operating nuclear capacity across 9 plants in the Global Energy Monitor dataset — 5.8% of the country's total operating power capacity of 253.7 GW.

The nuclear pipeline in Japan includes 4.55 GW under construction.

Other major nuclear plants in Japan include Takahama nuclear power plant (3.39 GW), Genkai nuclear power plant (2.36 GW) and Ohi nuclear power plant (2.36 GW).

See the full list: Nuclear power plants in Japan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 166 MW Retired gas-cooled reactor 1966 1998
2 1.10 GW Construction boiling water reactor 2026

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Tokai nuclear power plant

Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine. Gas-cooled reactors use carbon dioxide or helium as coolant and graphite as moderator.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Tokai nuclear power plant is located in Ibaraki, Japan, at approximately 36.4215, 140.6028. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Tokai nuclear power plant is owned by Japan Atomic Power Co. Across the dataset, Japan Atomic Power Co is linked to 2 power plants.

Frequently asked questions

What is the capacity of Tokai nuclear power plant?

Tokai nuclear power plant has a capacity of 1.10 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Tokai nuclear power plant?

Tokai nuclear power plant is a nuclear power plant. Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine.

Who owns Tokai nuclear power plant?

Tokai nuclear power plant is owned by Japan Atomic Power Co.

Where is Tokai nuclear power plant located?

It is located in Ibaraki, Japan. Approximate coordinates: 36.4215, 140.6028.

Is Tokai nuclear power plant operational?

According to the latest data, Tokai nuclear power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Tokai nuclear power plant expected to start?

Start year: 1966. Current status: Construction. 1 further units or phases are scheduled to come online in 2026. 1 units have already been retired (1998).

How big is Tokai nuclear power plant compared with other facilities in Japan?

Tokai nuclear power plant ranks #8 by capacity among 12 comparable nuclear facilities tracked in Japan.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects