Nuclear · Japan

Takahama nuclear power plant

Takahama nuclear power plant is a 3.39 GW nuclear power plant located in Fukui, Japan. The facility is currently in operation, with its first unit entering service in 1974.

3.39 GWCapacity
OperatingStatus
1974Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 3.39 GW).

Technology: pressurized water reactor.

Ownership: Kansai Electric Power Co.

Its 4 operating units were commissioned between 1974 and 1985.

Why it matters

  • The largest nuclear power plant in Japan by capacity, out of 9 operating nuclear facilities tracked in the country.
  • Provides about 23% of Japan's operating nuclear capacity and roughly 1.3% of all operating power capacity in the country in the dataset.
  • Ranks #36 worldwide among nuclear facilities of the same status group by capacity.
  • At a typical capacity factor of 85% for this technology, it would generate roughly 25 TWh of electricity a year (indicative estimate).

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in Japan

Japan has 14.6 GW of operating nuclear capacity across 9 plants in the Global Energy Monitor dataset — 5.8% of the country's total operating power capacity of 253.7 GW.

The nuclear pipeline in Japan includes 4.55 GW under construction.

Other major nuclear plants in Japan include Genkai nuclear power plant (2.36 GW), Ohi nuclear power plant (2.36 GW) and Tomari nuclear power plant (2.07 GW).

See the full list: Nuclear power plants in Japan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 826 MW Operating pressurized water reactor 1974
2 826 MW Operating pressurized water reactor 1975
3 870 MW Operating pressurized water reactor 1985
4 870 MW Operating pressurized water reactor 1985

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Takahama nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Takahama nuclear power plant is located in Fukui, Japan, at approximately 35.5223, 135.5036. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Takahama nuclear power plant is owned by Kansai Electric Power Co. Across the dataset, Kansai Electric Power Co is linked to 76 power plants in 8 countries, with 29.5 GW of operating capacity.

Frequently asked questions

What is the capacity of Takahama nuclear power plant?

Takahama nuclear power plant has a capacity of 3.39 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Takahama nuclear power plant?

Takahama nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Takahama nuclear power plant?

Takahama nuclear power plant is owned by Kansai Electric Power Co.

Where is Takahama nuclear power plant located?

It is located in Fukui, Japan. Approximate coordinates: 35.5223, 135.5036.

Is Takahama nuclear power plant operational?

According to the latest data, Takahama nuclear power plant is in operation. Operating means the facility is built and in commercial service.

When did Takahama nuclear power plant start operating?

Start year: 1974. Current status: Operating. Its 4 operating units were commissioned between 1974 and 1985.

How much electricity does Takahama nuclear power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Takahama nuclear power plant would produce about 25 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.

How big is Takahama nuclear power plant compared with other facilities in Japan?

Takahama nuclear power plant ranks #1 by capacity among 9 comparable nuclear facilities tracked in Japan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects