Coal · Japan

Kobe power station

Kobe power station is a 2.70 GW coal-fired power station located in Hyogo, Japan. The facility is currently in operation, with its first unit entering service in 2002.

2.70 GWCapacity
OperatingStatus
2002Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 2.70 GW).

Technology: supercritical, ultra-supercritical; fuel: coal: unknown.

Ownership: Kobelco Power Kobe Inc (parent company: Kobe Steel Ltd).

Its 4 operating units were commissioned between 2002 and 2023.

Why it matters

  • The 2nd-largest coal-fired power station in Japan by capacity (of 76 operating coal facilities tracked).
  • Provides about 5.1% of Japan's operating coal capacity and roughly 1.1% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 50% for this technology, it would generate roughly 12 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in Japan

Japan has 52.9 GW of operating coal capacity across 76 plants in the Global Energy Monitor dataset — 21% of the country's total operating power capacity of 253.7 GW.

The coal pipeline in Japan includes 2.95 GW at earlier planning stages.

Other major coal plants in Japan include Hekinan power station (4.10 GW), J-POWER Tachibana-wan power station (2.10 GW) and Haramachi power station (2.00 GW).

See the full list: Coal power plants in Japan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 700 MW Operating supercritical 2002
Unit 2 700 MW Operating supercritical 2004
Unit 3 650 MW Operating ultra-supercritical 2022
Unit 4 650 MW Operating ultra-supercritical 2023

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Kobe power station

Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Kobe power station is located in Hyogo, Japan, at approximately 34.7032, 135.2394. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Kobe power station is owned by Kobelco Power Kobe Inc. The ultimate parent company is Kobe Steel Ltd. Across the dataset, Kobe Steel Ltd is linked to 2 power plants with 3.95 GW of operating capacity.

Frequently asked questions

What is the capacity of Kobe power station?

Kobe power station has a capacity of 2.70 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Kobe power station?

Kobe power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Who owns Kobe power station?

Kobe power station is owned by Kobelco Power Kobe Inc. The ultimate parent company is Kobe Steel Ltd.

Where is Kobe power station located?

It is located in Hyogo, Japan. Approximate coordinates: 34.7032, 135.2394.

Is Kobe power station operational?

According to the latest data, Kobe power station is in operation. Operating means the facility is built and in commercial service.

When did Kobe power station start operating?

Start year: 2002. Current status: Operating. Its 4 operating units were commissioned between 2002 and 2023.

How much electricity does Kobe power station generate?

Actual output data are not published for every plant. As an indicative estimate, Kobe power station would produce about 12 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Kobe power station compared with other facilities in Japan?

Kobe power station ranks #2 by capacity among 76 comparable coal facilities tracked in Japan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.