Overview
Global Energy Monitor tracks 21 units or phases at this site (operating 5.33 GW).
Technology: combined cycle; fuel: LNG.
Ownership: JERA Co Inc (parent company: Chubu Electric Power Co Inc; Tokyo Electric Power Co).
Its 21 operating units were commissioned between 1985 and 2010.
Why it matters
- The largest oil- and gas-fired power station in Japan by capacity, out of 90 operating oil & gas facilities tracked in the country.
- Provides about 5.4% of Japan's operating oil & gas capacity and roughly 2.1% of all operating power capacity in the country in the dataset.
- Ranks #6 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 19 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Japan
Japan has 99.2 GW of operating oil & gas capacity across 90 plants in the Global Energy Monitor dataset — 39% of the country's total operating power capacity of 253.7 GW.
The oil & gas pipeline in Japan includes 1.75 GW at earlier planning stages.
Other major oil & gas plants in Japan include Kawagoe thermal power station (4.80 GW), Chiba thermal power station (4.38 GW) and Higashi Niigata thermal power station (4.11 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1-1 | 167 MW | combined cycle | 1985 | ||
| 1-2 | 167 MW | combined cycle | 1986 | ||
| 1-3 | 167 MW | combined cycle | 1986 | ||
| 1-4 | 167 MW | combined cycle | 1986 | ||
| 1-5 | 167 MW | combined cycle | 1986 | ||
| 1-6 | 167 MW | combined cycle | 1986 | ||
| 1-7 | 165 MW | combined cycle | 1986 | ||
| 2-1 | 162 MW | combined cycle | 1987 | ||
| 2-2 | 160 MW | combined cycle | 1988 | ||
| 2-3 | 162 MW | combined cycle | 1988 | ||
| 2-4 | 160 MW | combined cycle | 1988 | ||
| 2-5 | 160 MW | combined cycle | 1988 | ||
| 2-6 | 162 MW | combined cycle | 1988 | ||
| 2-7 | 160 MW | combined cycle | 1988 | ||
| 3-1 | 380 MW | combined cycle | 2003 | ||
| 3-2 | 380 MW | combined cycle | 2003 | ||
| 3-3 | 380 MW | combined cycle | 2001 | ||
| 3-4 | 380 MW | combined cycle | 2001 | ||
| 4-1 | 507 MW | combined cycle | 2008 | ||
| 4-2 | 507 MW | combined cycle | 2009 | ||
| 4-3 | 507 MW | combined cycle | 2010 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Futtsu thermal power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Futtsu thermal power station is located in Chiba, Japan, at approximately 35.3447, 139.8349. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Futtsu thermal power station is owned by JERA Co Inc. The ultimate parent company is Chubu Electric Power Co Inc; Tokyo Electric Power Co. Across the dataset, Chubu Electric Power Co Inc is linked to 96 power plants in 11 countries, with 86.2 GW of operating capacity.
Frequently asked questions
What is the capacity of Futtsu thermal power station?
Futtsu thermal power station has a capacity of 5.33 GW according to the latest Global Energy Monitor data. This figure covers the 21 units or phases listed for the site.
What type of facility is Futtsu thermal power station?
Futtsu thermal power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Futtsu thermal power station?
Futtsu thermal power station is owned by JERA Co Inc. The ultimate parent company is Chubu Electric Power Co Inc; Tokyo Electric Power Co.
Where is Futtsu thermal power station located?
It is located in Chiba, Japan. Approximate coordinates: 35.3447, 139.8349.
Is Futtsu thermal power station operational?
According to the latest data, Futtsu thermal power station is in operation. Operating means the facility is built and in commercial service.
When did Futtsu thermal power station start operating?
Start year: 1985. Current status: Operating. Its 21 operating units were commissioned between 1985 and 2010.
How much electricity does Futtsu thermal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Futtsu thermal power station would produce about 19 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Futtsu thermal power station compared with other facilities in Japan?
Futtsu thermal power station ranks #1 by capacity among 90 comparable oil & gas facilities tracked in Japan.