Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.15 GW).
Technology: steam turbine, combined cycle; fuel: industrial by-product: blast furnace gas, industrial by-product: coke oven gas.
Ownership: Kimitsu Cooperative Thermal Power Co (parent company: Nippon Steel Corp; Chubu Electric Power Co Inc; Tokyo Electric Power Co).
Its 4 operating units were commissioned between 1970 and 2011.
Why it matters
- Provides about 1.2% of Japan's operating oil & gas capacity and roughly 0.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.0 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Japan
Japan has 99.2 GW of operating oil & gas capacity across 90 plants in the Global Energy Monitor dataset — 39% of the country's total operating power capacity of 253.7 GW.
The oil & gas pipeline in Japan includes 1.75 GW at earlier planning stages.
Other major oil & gas plants in Japan include Futtsu thermal power station (5.33 GW), Kawagoe thermal power station (4.80 GW) and Chiba thermal power station (4.38 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 3 | 350 MW | steam turbine | 1970 | ||
| 4 | 350 MW | steam turbine | 1970 | ||
| 5 | 300 MW | combined cycle | 2004 | ||
| 6 | 153 MW | combined cycle | 2011 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Kimitsu power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Kimitsu power station is located in Chiba, Japan, at approximately 35.3693, 139.8615. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Kimitsu power station is owned by Kimitsu Cooperative Thermal Power Co. The ultimate parent company is Nippon Steel Corp; Chubu Electric Power Co Inc; Tokyo Electric Power Co. Across the dataset, Nippon Steel Corp is linked to 16 power plants in 4 countries, with 7.90 GW of operating capacity.
Frequently asked questions
What is the capacity of Kimitsu power station?
Kimitsu power station has a capacity of 1.15 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Kimitsu power station?
Kimitsu power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Kimitsu power station?
Kimitsu power station is owned by Kimitsu Cooperative Thermal Power Co. The ultimate parent company is Nippon Steel Corp; Chubu Electric Power Co Inc; Tokyo Electric Power Co.
Where is Kimitsu power station located?
It is located in Chiba, Japan. Approximate coordinates: 35.3693, 139.8615.
Is Kimitsu power station operational?
According to the latest data, Kimitsu power station is in operation. Operating means the facility is built and in commercial service.
When did Kimitsu power station start operating?
Start year: 1970. Current status: Operating. Its 4 operating units were commissioned between 1970 and 2011.
How much electricity does Kimitsu power station generate?
Actual output data are not published for every plant. As an indicative estimate, Kimitsu power station would produce about 4.0 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Kimitsu power station compared with other facilities in Japan?
Kimitsu power station ranks #33 by capacity among 90 comparable oil & gas facilities tracked in Japan.