Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 2.00 GW, under construction 4.00 GW, planned 2.40 GW).
Technology: pressurized water reactor.
Ownership: Nuclear Power Corporation Of India Ltd.
Its 2 operating units were commissioned between 2014 and 2017. 4 further units or phases are scheduled to come online in 2027–2030.
Why it matters
- The largest nuclear power plant in India by capacity, out of 7 operating nuclear facilities tracked in the country.
- Provides about 24% of India's operating nuclear capacity.
- Ranks #90 worldwide among nuclear facilities of the same status group by capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 15 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in India
India has 8.40 GW of operating nuclear capacity across 7 plants in the Global Energy Monitor dataset — 1.7% of the country's total operating power capacity of 485.3 GW.
The nuclear pipeline in India includes 1.70 GW under construction and 28.3 GW at earlier planning stages.
Other major nuclear plants in India include Kakrapar nuclear power plant (1.84 GW), Rajasthan nuclear power plant (1.78 GW) and Kalpakkam nuclear power plant (1.70 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 1.00 GW | pressurized water reactor | 2014 | ||
| 2 | 1.00 GW | pressurized water reactor | 2017 | ||
| 3 | 1.00 GW | Construction | pressurized water reactor | 2027 | |
| 4 | 1.00 GW | Construction | pressurized water reactor | 2027 | |
| 5 | 1.00 GW | Construction | pressurized water reactor | 2030 | |
| 6 | 1.00 GW | Construction | pressurized water reactor | 2030 | |
| 7 | 1.20 GW | Announced | pressurized water reactor | ||
| 8 | 1.20 GW | Announced | pressurized water reactor |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Kudankulam nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Location
Kudankulam nuclear power plant is located in Tamil Nadu, India, at approximately 8.1689, 77.7126. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Kudankulam nuclear power plant is owned by Nuclear Power Corporation Of India Ltd. Across the dataset, Nuclear Power Corporation Of India Ltd is linked to 14 power plants with 8.40 GW of operating capacity.
Frequently asked questions
What is the capacity of Kudankulam nuclear power plant?
Kudankulam nuclear power plant has a capacity of 2.00 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Kudankulam nuclear power plant?
Kudankulam nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Kudankulam nuclear power plant?
Kudankulam nuclear power plant is owned by Nuclear Power Corporation Of India Ltd.
Where is Kudankulam nuclear power plant located?
It is located in Tamil Nadu, India. Approximate coordinates: 8.1689, 77.7126.
Is Kudankulam nuclear power plant operational?
According to the latest data, Kudankulam nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Kudankulam nuclear power plant start operating?
Start year: 2014. Current status: Operating. Its 2 operating units were commissioned between 2014 and 2017. 4 further units or phases are scheduled to come online in 2027–2030.
How much electricity does Kudankulam nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Kudankulam nuclear power plant would produce about 15 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Kudankulam nuclear power plant compared with other facilities in India?
Kudankulam nuclear power plant ranks #1 by capacity among 7 comparable nuclear facilities tracked in India.