Overview
Global Energy Monitor tracks 9 units or phases at this site (operating 2.00 GW, under construction 1.60 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: bituminous, coal: unknown.
Ownership: NTPC Ltd.
Its 7 operating units were commissioned between 1982 and 1987. 2 further units or phases are scheduled to come online in 2029–2030.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 8.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 200 MW | subcritical | 1982 | ||
| Unit 2 | 200 MW | subcritical | 1982 | ||
| Unit 3 | 200 MW | subcritical | 1983 | ||
| Unit 4 | 200 MW | subcritical | 1983 | ||
| Unit 5 | 200 MW | subcritical | 1984 | ||
| Unit 6 | 500 MW | subcritical | 1986 | ||
| Unit 7 | 500 MW | subcritical | 1987 | ||
| Unit 8 | 800 MW | Construction | ultra-supercritical | 2029 | |
| Unit 9 | 800 MW | Construction | ultra-supercritical | 2030 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Singrauli Super Thermal Power Station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Singrauli Super Thermal Power Station is located in Uttar Pradesh, India, at approximately 24.1042, 82.7064. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Singrauli Super Thermal Power Station is owned by NTPC Ltd. Across the dataset, NTPC Ltd is linked to 109 power plants in 4 countries, with 80.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Singrauli Super Thermal Power Station?
Singrauli Super Thermal Power Station has a capacity of 2.00 GW according to the latest Global Energy Monitor data. This figure covers the 9 units or phases listed for the site.
What type of facility is Singrauli Super Thermal Power Station?
Singrauli Super Thermal Power Station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Singrauli Super Thermal Power Station?
Singrauli Super Thermal Power Station is owned by NTPC Ltd.
Where is Singrauli Super Thermal Power Station located?
It is located in Uttar Pradesh, India. Approximate coordinates: 24.1042, 82.7064.
Is Singrauli Super Thermal Power Station operational?
According to the latest data, Singrauli Super Thermal Power Station is in operation. Operating means the facility is built and in commercial service.
When did Singrauli Super Thermal Power Station start operating?
Start year: 1982. Current status: Operating. Its 7 operating units were commissioned between 1982 and 1987. 2 further units or phases are scheduled to come online in 2029–2030.
How much electricity does Singrauli Super Thermal Power Station generate?
Actual output data are not published for every plant. As an indicative estimate, Singrauli Super Thermal Power Station would produce about 8.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Singrauli Super Thermal Power Station compared with other facilities in India?
Singrauli Super Thermal Power Station ranks #31 by capacity among 285 comparable coal facilities tracked in India.