Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 2.98 GW, under construction 800 MW).
Technology: supercritical, subcritical, ultra-supercritical; fuel: coal: unknown.
Ownership: NTPC Ltd.
Its 5 operating units were commissioned between 2007 and 2012. 1 further units or phases are scheduled to come online in 2029.
Why it matters
- The 11th-largest coal-fired power station in India by capacity (of 285 operating coal facilities tracked).
- Provides about 1.2% of India's operating coal capacity and roughly 0.6% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 13 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 660 MW | supercritical | 2011 | ||
| Unit 2 | 660 MW | supercritical | 2011 | ||
| Unit 3 | 660 MW | supercritical | 2012 | ||
| Unit 4 | 500 MW | subcritical | 2007 | ||
| Unit 5 | 500 MW | subcritical | 2008 | ||
| Unit 6 | 800 MW | Construction | ultra-supercritical | 2029 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Sipat power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Sipat power station is located in Chhattisgarh, India, at approximately 22.1317, 82.2904. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Sipat power station is owned by NTPC Ltd. Across the dataset, NTPC Ltd is linked to 109 power plants in 4 countries, with 80.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Sipat power station?
Sipat power station has a capacity of 2.98 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Sipat power station?
Sipat power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Sipat power station?
Sipat power station is owned by NTPC Ltd.
Where is Sipat power station located?
It is located in Chhattisgarh, India. Approximate coordinates: 22.1317, 82.2904.
Is Sipat power station operational?
According to the latest data, Sipat power station is in operation. Operating means the facility is built and in commercial service.
When did Sipat power station start operating?
Start year: 2007. Current status: Operating. Its 5 operating units were commissioned between 2007 and 2012. 1 further units or phases are scheduled to come online in 2029.
How much electricity does Sipat power station generate?
Actual output data are not published for every plant. As an indicative estimate, Sipat power station would produce about 13 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Sipat power station compared with other facilities in India?
Sipat power station ranks #11 by capacity among 285 comparable coal facilities tracked in India.