Coal · India

Adani Anuppur Thermal Power Plant

Adani Anuppur Thermal Power Plant is a 3.20 GW coal-fired power station located in Madhya Pradesh, India. The facility is currently under construction, with a targeted start date of 2029.

3.20 GWCapacity (all phases)
ConstructionStatus
2029Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (under construction 2.40 GW, planned 800 MW).

Technology: ultra-supercritical; fuel: coal: unknown.

Ownership: Anuppur Thermal Energy (MP) Pvt Ltd.

3 further units or phases are scheduled to come online in 2029–2031.

Why it matters

  • The 10th-largest coal-fired power station in India by capacity (of 318 operating, under-construction and planned coal facilities tracked).
  • If completed, it would add 3.20 GW to India's coal fleet — equivalent to 1.3% of today's operating coal capacity.

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in India

India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.

The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.

Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).

See the full list: Coal power plants in India →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 800 MW Construction ultra-supercritical 2029
Unit 2 800 MW Construction ultra-supercritical 2029
Unit 3 800 MW Construction ultra-supercritical 2031
Unit 4 800 MW Pre-construction ultra-supercritical

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Adani Anuppur Thermal Power Plant

Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Adani Anuppur Thermal Power Plant is located in Madhya Pradesh, India, at approximately 23.2070, 81.9793. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Adani Anuppur Thermal Power Plant is owned by Anuppur Thermal Energy (MP) Pvt Ltd.

Frequently asked questions

What is the capacity of Adani Anuppur Thermal Power Plant?

Adani Anuppur Thermal Power Plant has a capacity of 3.20 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Adani Anuppur Thermal Power Plant?

Adani Anuppur Thermal Power Plant is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Who owns Adani Anuppur Thermal Power Plant?

Adani Anuppur Thermal Power Plant is owned by Anuppur Thermal Energy (MP) Pvt Ltd.

Where is Adani Anuppur Thermal Power Plant located?

It is located in Madhya Pradesh, India. Approximate coordinates: 23.2070, 81.9793.

Is Adani Anuppur Thermal Power Plant operational?

According to the latest data, Adani Anuppur Thermal Power Plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Adani Anuppur Thermal Power Plant expected to start?

Start year: 2029. Current status: Construction. 3 further units or phases are scheduled to come online in 2029–2031.

How big is Adani Anuppur Thermal Power Plant compared with other facilities in India?

Adani Anuppur Thermal Power Plant ranks #10 by capacity among 318 comparable coal facilities tracked in India.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects