KSK Mahanadi Power Project

KSK Mahanadi Power Project is a 1.80 GW coal-fired power station located in Chhattisgarh, India. The facility is currently in operation, with its first unit entering service in 2013.

1.80 GWCapacity
OperatingStatus
2013Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (operating 1.80 GW, under construction 1.80 GW).

Technology: subcritical; fuel: coal: unknown.

Ownership: KSK Mahanadi Power Co Ltd (parent company: JSW Energy Ltd).

Its 3 operating units were commissioned between 2013 and 2018. 3 further units or phases are scheduled to come online in 2029.

Why it matters

  • At a typical capacity factor of 50% for this technology, it would generate roughly 7.9 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in India

India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.

The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.

Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).

See the full list: Coal power plants in India →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 600 MW Operating subcritical 2013
Unit 2 600 MW Operating subcritical 2014
Unit 3 600 MW Operating subcritical 2018
Unit 4 600 MW Construction subcritical 2029
Unit 5 600 MW Construction subcritical 2029
Unit 6 600 MW Construction subcritical 2029

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at KSK Mahanadi Power Project

Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Location

Imagery © Esri, Maxar, Earthstar Geographics

KSK Mahanadi Power Project is located in Chhattisgarh, India, at approximately 21.9603, 82.4091. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

KSK Mahanadi Power Project is owned by KSK Mahanadi Power Co Ltd. The ultimate parent company is JSW Energy Ltd. Across the dataset, JSW Energy Ltd is linked to 25 power plants with 8.76 GW of operating capacity.

Frequently asked questions

What is the capacity of KSK Mahanadi Power Project?

KSK Mahanadi Power Project has a capacity of 1.80 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is KSK Mahanadi Power Project?

KSK Mahanadi Power Project is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Who owns KSK Mahanadi Power Project?

KSK Mahanadi Power Project is owned by KSK Mahanadi Power Co Ltd. The ultimate parent company is JSW Energy Ltd.

Where is KSK Mahanadi Power Project located?

It is located in Chhattisgarh, India. Approximate coordinates: 21.9603, 82.4091.

Is KSK Mahanadi Power Project operational?

According to the latest data, KSK Mahanadi Power Project is in operation. Operating means the facility is built and in commercial service.

When did KSK Mahanadi Power Project start operating?

Start year: 2013. Current status: Operating. Its 3 operating units were commissioned between 2013 and 2018. 3 further units or phases are scheduled to come online in 2029.

How much electricity does KSK Mahanadi Power Project generate?

Actual output data are not published for every plant. As an indicative estimate, KSK Mahanadi Power Project would produce about 7.9 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is KSK Mahanadi Power Project compared with other facilities in India?

KSK Mahanadi Power Project ranks #43 by capacity among 285 comparable coal facilities tracked in India.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects