Overview
Global Energy Monitor tracks 13 units or phases at this site (operating 1.08 GW, planned 1.08 GW).
Technology: subcritical, supercritical; fuel: coal: lignite.
Ownership: JSW Energy Ltd.
Its 8 operating units were commissioned between 2010 and 2013.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 4.7 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 135 MW | subcritical | 2010 | ||
| Unit 2 | 135 MW | subcritical | 2010 | ||
| Unit 3 | 135 MW | subcritical | 2011 | ||
| Unit 4 | 135 MW | subcritical | 2011 | ||
| Unit 5 | 135 MW | subcritical | 2013 | ||
| Unit 6 | 135 MW | subcritical | 2013 | ||
| Unit 7 | 135 MW | subcritical | 2013 | ||
| Unit 8 | 135 MW | subcritical | 2013 | ||
| Unit 9 | 540 MW | Cancelled | supercritical | ||
| Unit 10 | 540 MW | Cancelled | supercritical | ||
| Unit 11 | 360 MW | Announced | supercritical | ||
| Unit 12 | 360 MW | Announced | supercritical | ||
| Unit 13 | 360 MW | Announced | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at JSW Barmer Jalipa Kapurdi power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
JSW Barmer Jalipa Kapurdi power station is located in Rajasthan, India, at approximately 25.8954, 71.3299. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
JSW Barmer Jalipa Kapurdi power station is owned by JSW Energy Ltd. Across the dataset, JSW Energy Ltd is linked to 25 power plants with 8.76 GW of operating capacity.
Frequently asked questions
What is the capacity of JSW Barmer Jalipa Kapurdi power station?
JSW Barmer Jalipa Kapurdi power station has a capacity of 1.08 GW according to the latest Global Energy Monitor data. This figure covers the 13 units or phases listed for the site.
What type of facility is JSW Barmer Jalipa Kapurdi power station?
JSW Barmer Jalipa Kapurdi power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns JSW Barmer Jalipa Kapurdi power station?
JSW Barmer Jalipa Kapurdi power station is owned by JSW Energy Ltd.
Where is JSW Barmer Jalipa Kapurdi power station located?
It is located in Rajasthan, India. Approximate coordinates: 25.8954, 71.3299.
Is JSW Barmer Jalipa Kapurdi power station operational?
According to the latest data, JSW Barmer Jalipa Kapurdi power station is in operation. Operating means the facility is built and in commercial service.
When did JSW Barmer Jalipa Kapurdi power station start operating?
Start year: 2010. Current status: Operating. Its 8 operating units were commissioned between 2010 and 2013.
How much electricity does JSW Barmer Jalipa Kapurdi power station generate?
Actual output data are not published for every plant. As an indicative estimate, JSW Barmer Jalipa Kapurdi power station would produce about 4.7 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is JSW Barmer Jalipa Kapurdi power station compared with other facilities in India?
JSW Barmer Jalipa Kapurdi power station ranks #101 by capacity among 285 comparable coal facilities tracked in India.