Overview
Global Energy Monitor tracks 13 units or phases at this site (operating 4.76 GW).
Technology: subcritical; fuel: coal: bituminous.
Ownership: NTPC Ltd.
Its 13 operating units were commissioned between 1987 and 2015.
Why it matters
- The largest coal-fired power station in India by capacity, out of 285 operating coal facilities tracked in the country.
- Provides about 1.9% of India's operating coal capacity and roughly 1% of all operating power capacity in the country in the dataset.
- Ranks #20 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 21 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Mundra Thermal Power Project (Adani) (4.62 GW), Ramagundam power station (4.20 GW) and Tata Mundra Ultra Mega Power Project (4.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase 1 Unit 1 | 210 MW | subcritical | 1987 | ||
| Phase 1 Unit 2 | 210 MW | subcritical | 1988 | ||
| Phase 1 Unit 3 | 210 MW | subcritical | 1989 | ||
| Phase 1 Unit 4 | 210 MW | subcritical | 1989 | ||
| Phase 1 Unit 5 | 210 MW | subcritical | 1990 | ||
| Phase 1 Unit 6 | 210 MW | subcritical | 1991 | ||
| Phase 2 Unit 1 | 500 MW | subcritical | 1999 | ||
| Phase 2 Unit 2 | 500 MW | subcritical | 2000 | ||
| Phase 3 Unit 1 | 500 MW | subcritical | 2006 | ||
| Phase 3 Unit 2 | 500 MW | subcritical | 2007 | ||
| Phase IV unit 11 | 500 MW | subcritical | 2012 | ||
| Phase IV units 12 | 500 MW | subcritical | 2013 | ||
| Phase V Unit 13 | 500 MW | subcritical | 2015 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Vindhyachal power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Vindhyachal power station is located in Madhya Pradesh, India, at approximately 24.0983, 82.6719. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Vindhyachal power station is owned by NTPC Ltd. Across the dataset, NTPC Ltd is linked to 109 power plants in 4 countries, with 80.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Vindhyachal power station?
Vindhyachal power station has a capacity of 4.76 GW according to the latest Global Energy Monitor data. This figure covers the 13 units or phases listed for the site.
What type of facility is Vindhyachal power station?
Vindhyachal power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Vindhyachal power station?
Vindhyachal power station is owned by NTPC Ltd.
Where is Vindhyachal power station located?
It is located in Madhya Pradesh, India. Approximate coordinates: 24.0983, 82.6719.
Is Vindhyachal power station operational?
According to the latest data, Vindhyachal power station is in operation. Operating means the facility is built and in commercial service.
When did Vindhyachal power station start operating?
Start year: 1987. Current status: Operating. Its 13 operating units were commissioned between 1987 and 2015.
How much electricity does Vindhyachal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Vindhyachal power station would produce about 21 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Vindhyachal power station compared with other facilities in India?
Vindhyachal power station ranks #1 by capacity among 285 comparable coal facilities tracked in India.