Overview
Global Energy Monitor tracks 12 units or phases at this site (operating 4.62 GW).
Technology: subcritical, supercritical; fuel: coal: bituminous.
Ownership: Adani Power Ltd.
Its 9 operating units were commissioned between 2009 and 2012.
Why it matters
- The 2nd-largest coal-fired power station in India by capacity (of 285 operating coal facilities tracked).
- Provides about 1.8% of India's operating coal capacity and roughly 1% of all operating power capacity in the country in the dataset.
- Ranks #25 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 20 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Ramagundam power station (4.20 GW) and Tata Mundra Ultra Mega Power Project (4.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 330 MW | subcritical | 2009 | ||
| Phase I Unit 2 | 330 MW | subcritical | 2010 | ||
| Phase II Unit 3 | 330 MW | subcritical | 2010 | ||
| Phase II Unit 4 | 330 MW | subcritical | 2010 | ||
| Phase III Unit 5 | 660 MW | supercritical | 2010 | ||
| Phase III Unit 6 | 660 MW | supercritical | 2011 | ||
| Phase IV Unit 7 | 660 MW | supercritical | 2011 | ||
| Phase IV Unit 8 | 660 MW | supercritical | 2012 | ||
| Phase IV Unit 9 | 660 MW | supercritical | 2012 | ||
| Phase V Unit 10 | 1.00 GW | Cancelled | supercritical | ||
| Phase V Unit 11 | 1.00 GW | Cancelled | supercritical | ||
| Phase V Unit 12 | 1.00 GW | Cancelled | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Mundra Thermal Power Project (Adani)
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Mundra Thermal Power Project (Adani) is located in Gujarat, India, at approximately 22.8235, 69.5575. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Mundra Thermal Power Project (Adani) is owned by Adani Power Ltd. Across the dataset, Adani Power Ltd is linked to 16 power plants with 18.8 GW of operating capacity.
Frequently asked questions
What is the capacity of Mundra Thermal Power Project (Adani)?
Mundra Thermal Power Project (Adani) has a capacity of 4.62 GW according to the latest Global Energy Monitor data. This figure covers the 12 units or phases listed for the site.
What type of facility is Mundra Thermal Power Project (Adani)?
Mundra Thermal Power Project (Adani) is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Mundra Thermal Power Project (Adani)?
Mundra Thermal Power Project (Adani) is owned by Adani Power Ltd.
Where is Mundra Thermal Power Project (Adani) located?
It is located in Gujarat, India. Approximate coordinates: 22.8235, 69.5575.
Is Mundra Thermal Power Project (Adani) operational?
According to the latest data, Mundra Thermal Power Project (Adani) is in operation. Operating means the facility is built and in commercial service.
When did Mundra Thermal Power Project (Adani) start operating?
Start year: 2009. Current status: Operating. Its 9 operating units were commissioned between 2009 and 2012.
How much electricity does Mundra Thermal Power Project (Adani) generate?
Actual output data are not published for every plant. As an indicative estimate, Mundra Thermal Power Project (Adani) would produce about 20 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Mundra Thermal Power Project (Adani) compared with other facilities in India?
Mundra Thermal Power Project (Adani) ranks #2 by capacity among 285 comparable coal facilities tracked in India.