Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.20 GW).
Technology: subcritical, supercritical; fuel: coal: unknown.
Ownership: Moxie Power Generation Ltd (parent company: Dickey Alternative Investment Trust; Adani Power Ltd).
Its 2 operating units were commissioned between 2014 and 2016.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 600 MW | subcritical | 2014 | ||
| Unit 2 | 600 MW | subcritical | 2016 | ||
| Unit 3 | 800 MW | Cancelled | supercritical | ||
| Unit 4 | 800 MW | Cancelled | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Moxie Power Melamaruthur Thermal Power Plant
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Moxie Power Melamaruthur Thermal Power Plant is located in Tamil Nadu, India, at approximately 8.9127, 78.1450. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Moxie Power Melamaruthur Thermal Power Plant is owned by Moxie Power Generation Ltd. The ultimate parent company is Dickey Alternative Investment Trust; Adani Power Ltd.
Frequently asked questions
What is the capacity of Moxie Power Melamaruthur Thermal Power Plant?
Moxie Power Melamaruthur Thermal Power Plant has a capacity of 1.20 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Moxie Power Melamaruthur Thermal Power Plant?
Moxie Power Melamaruthur Thermal Power Plant is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Moxie Power Melamaruthur Thermal Power Plant?
Moxie Power Melamaruthur Thermal Power Plant is owned by Moxie Power Generation Ltd. The ultimate parent company is Dickey Alternative Investment Trust; Adani Power Ltd.
Where is Moxie Power Melamaruthur Thermal Power Plant located?
It is located in Tamil Nadu, India. Approximate coordinates: 8.9127, 78.1450.
Is Moxie Power Melamaruthur Thermal Power Plant operational?
According to the latest data, Moxie Power Melamaruthur Thermal Power Plant is in operation. Operating means the facility is built and in commercial service.
When did Moxie Power Melamaruthur Thermal Power Plant start operating?
Start year: 2014. Current status: Operating. Its 2 operating units were commissioned between 2014 and 2016.
How much electricity does Moxie Power Melamaruthur Thermal Power Plant generate?
Actual output data are not published for every plant. As an indicative estimate, Moxie Power Melamaruthur Thermal Power Plant would produce about 5.3 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Moxie Power Melamaruthur Thermal Power Plant compared with other facilities in India?
Moxie Power Melamaruthur Thermal Power Plant ranks #84 by capacity among 285 comparable coal facilities tracked in India.