Overview
Global Energy Monitor tracks 6 units or phases at this site (under construction 1.32 GW, planned 2.64 GW).
Technology: supercritical; fuel: coal: unknown.
Ownership: Tamil Nadu Power Generation Corp Ltd.
2 further units or phases are scheduled to come online in 2026.
Why it matters
- The 6th-largest coal-fired power station in India by capacity (of 318 operating, under-construction and planned coal facilities tracked).
- If completed, it would add 3.96 GW to India's coal fleet — equivalent to 1.6% of today's operating coal capacity.
- Ranks #74 worldwide among coal facilities of the same status group by capacity.
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 660 MW | Construction | supercritical | 2026 | |
| Unit 2 | 660 MW | Construction | supercritical | 2026 | |
| Unit 3 | 660 MW | Pre-construction | supercritical | ||
| Unit 4 | 660 MW | Pre-construction | supercritical | ||
| Unit 5 | 660 MW | Pre-construction | supercritical | ||
| Unit 6 | 660 MW | Pre-construction | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Udangudi Super Critical Thermal Power Project
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Location
Udangudi Super Critical Thermal Power Project is located in Tamil Nadu, India, at approximately 8.4347, 78.0611. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Udangudi Super Critical Thermal Power Project is owned by Tamil Nadu Power Generation Corp Ltd. Across the dataset, Tamil Nadu Power Generation Corp Ltd is linked to 2 power plants.
Frequently asked questions
What is the capacity of Udangudi Super Critical Thermal Power Project?
Udangudi Super Critical Thermal Power Project has a capacity of 3.96 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Udangudi Super Critical Thermal Power Project?
Udangudi Super Critical Thermal Power Project is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Udangudi Super Critical Thermal Power Project?
Udangudi Super Critical Thermal Power Project is owned by Tamil Nadu Power Generation Corp Ltd.
Where is Udangudi Super Critical Thermal Power Project located?
It is located in Tamil Nadu, India. Approximate coordinates: 8.4347, 78.0611.
Is Udangudi Super Critical Thermal Power Project operational?
According to the latest data, Udangudi Super Critical Thermal Power Project is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Udangudi Super Critical Thermal Power Project expected to start?
Start year: 2026. Current status: Construction. 2 further units or phases are scheduled to come online in 2026.
How big is Udangudi Super Critical Thermal Power Project compared with other facilities in India?
Udangudi Super Critical Thermal Power Project ranks #6 by capacity among 318 comparable coal facilities tracked in India.