Hydropower · India

Subansiri Lower hydroelectric plant

Subansiri Lower hydroelectric plant is a 2.00 GW hydropower plant located in Assam, India. The facility is currently under construction, with a targeted start date of 2026.

2.00 GWCapacity (all phases)
ConstructionStatus
2026Start year
View on the interactive map →

Overview

Technology: run-of-river.

Ownership: NHPC Ltd.

Why it matters

  • The 16th-largest hydropower plant in India by capacity (of 391 operating, under-construction and planned hydropower facilities tracked).
  • If completed, it would add 2.00 GW to India's hydropower fleet — equivalent to 3.9% of today's operating hydropower capacity.

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in India

India has 51.2 GW of operating hydropower capacity across 224 plants in the Global Energy Monitor dataset — 11% of the country's total operating power capacity of 485.3 GW.

The hydropower pipeline in India includes 24.9 GW under construction and 126.4 GW at earlier planning stages.

Other major hydropower plants in India include Dibang Multipurpose hydroelectric plant (2.88 GW), Sharavathy Pumped Storage hydroelectric plant (2.00 GW) and Gandhi Sagar New hydroelectric plant (1.92 GW).

See the full list: Hydropower plants in India →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Subansiri Lower hydroelectric plant

Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Subansiri Lower hydroelectric plant is located in Assam, India, at approximately 27.5529, 94.2596. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Subansiri Lower hydroelectric plant is owned by NHPC Ltd. Across the dataset, NHPC Ltd is linked to 59 power plants with 4.84 GW of operating capacity.

Frequently asked questions

What is the capacity of Subansiri Lower hydroelectric plant?

Subansiri Lower hydroelectric plant has a capacity of 2.00 GW according to the latest Global Energy Monitor data.

What type of facility is Subansiri Lower hydroelectric plant?

Subansiri Lower hydroelectric plant is a hydropower plant. Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Who owns Subansiri Lower hydroelectric plant?

Subansiri Lower hydroelectric plant is owned by NHPC Ltd.

Where is Subansiri Lower hydroelectric plant located?

It is located in Assam, India. Approximate coordinates: 27.5529, 94.2596.

Is Subansiri Lower hydroelectric plant operational?

According to the latest data, Subansiri Lower hydroelectric plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Subansiri Lower hydroelectric plant expected to start?

Start year: 2026. Current status: Construction.

How big is Subansiri Lower hydroelectric plant compared with other facilities in India?

Subansiri Lower hydroelectric plant ranks #16 by capacity among 391 comparable hydropower facilities tracked in India.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects