Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 1.07 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: TNB Prai Sdn Bhd (parent company: Tenaga Nasional Bhd).
2 operating units have a planned retirement date, the earliest in 2036.
Why it matters
- The 8th-largest oil- and gas-fired power station in Malaysia by capacity (of 26 operating oil & gas facilities tracked).
- Provides about 6.2% of Malaysia's operating oil & gas capacity and roughly 2.7% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.8 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), New Kapar power plant (2.10 GW) and Pengerang Co-generation plant (1.90 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 536 MW | combined cycle | 2016 | 2036 | |
| 2 | 536 MW | combined cycle | 2016 | 2036 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Prai (TNB) power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Prai (TNB) power station is located in Pulau Pinang, Malaysia, at approximately 5.3744, 100.3746. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Prai (TNB) power station is owned by TNB Prai Sdn Bhd. The ultimate parent company is Tenaga Nasional Bhd. Across the dataset, Tenaga Nasional Bhd is linked to 35 power plants in 3 countries, with 17.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Prai (TNB) power station?
Prai (TNB) power station has a capacity of 1.07 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Prai (TNB) power station?
Prai (TNB) power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Prai (TNB) power station?
Prai (TNB) power station is owned by TNB Prai Sdn Bhd. The ultimate parent company is Tenaga Nasional Bhd.
Where is Prai (TNB) power station located?
It is located in Pulau Pinang, Malaysia. Approximate coordinates: 5.3744, 100.3746.
Is Prai (TNB) power station operational?
According to the latest data, Prai (TNB) power station is in operation. Operating means the facility is built and in commercial service.
When did Prai (TNB) power station start operating?
Start year: 2016. Current status: Operating. 2 operating units have a planned retirement date, the earliest in 2036.
How much electricity does Prai (TNB) power station generate?
Actual output data are not published for every plant. As an indicative estimate, Prai (TNB) power station would produce about 3.8 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Prai (TNB) power station compared with other facilities in Malaysia?
Prai (TNB) power station ranks #8 by capacity among 26 comparable oil & gas facilities tracked in Malaysia.