Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 1.30 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Employees Provident Fund of Malaysia; Malakoff Corporation Bhd (parent company: Malakoff Corporation Bhd; Employees Provident Fund of Malaysia).
Its 2 operating units were commissioned between 1996 and 1997. 2 operating units have a planned retirement date, the earliest in 2029.
Why it matters
- The 5th-largest oil- and gas-fired power station in Malaysia by capacity (of 26 operating oil & gas facilities tracked).
- Provides about 7.5% of Malaysia's operating oil & gas capacity and roughly 3.2% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.6 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), New Kapar power plant (2.10 GW) and Pengerang Co-generation plant (1.90 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 652 MW | combined cycle | 1996 | 2029 | |
| 2 | 652 MW | combined cycle | 1997 | 2029 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Lumut SEV power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Lumut SEV power station is located in Perak, Malaysia, at approximately 4.3908, 100.5894. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Lumut SEV power station is owned by Employees Provident Fund of Malaysia; Malakoff Corporation Bhd. The ultimate parent company is Malakoff Corporation Bhd; Employees Provident Fund of Malaysia. Across the dataset, Malakoff Corporation Bhd is linked to 9 power plants in 4 countries, with 8.97 GW of operating capacity.
Frequently asked questions
What is the capacity of Lumut SEV power station?
Lumut SEV power station has a capacity of 1.30 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Lumut SEV power station?
Lumut SEV power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Lumut SEV power station?
Lumut SEV power station is owned by Employees Provident Fund of Malaysia; Malakoff Corporation Bhd. The ultimate parent company is Malakoff Corporation Bhd; Employees Provident Fund of Malaysia.
Where is Lumut SEV power station located?
It is located in Perak, Malaysia. Approximate coordinates: 4.3908, 100.5894.
Is Lumut SEV power station operational?
According to the latest data, Lumut SEV power station is in operation. Operating means the facility is built and in commercial service.
When did Lumut SEV power station start operating?
Start year: 1996. Current status: Operating. Its 2 operating units were commissioned between 1996 and 1997. 2 operating units have a planned retirement date, the earliest in 2029.
How much electricity does Lumut SEV power station generate?
Actual output data are not published for every plant. As an indicative estimate, Lumut SEV power station would produce about 4.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Lumut SEV power station compared with other facilities in Malaysia?
Lumut SEV power station ranks #5 by capacity among 26 comparable oil & gas facilities tracked in Malaysia.