Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 1.16 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Sarawak Energy Bhd.
Its 3 operating units were commissioned between 2010 and 2022.
Why it matters
- The 7th-largest oil- and gas-fired power station in Malaysia by capacity (of 26 operating oil & gas facilities tracked).
- Provides about 6.7% of Malaysia's operating oil & gas capacity and roughly 2.9% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.1 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), New Kapar power plant (2.10 GW) and Pengerang Co-generation plant (1.90 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC1 | 317 MW | combined cycle | 2010 | ||
| CC2 | 421 MW | combined cycle | 2022 | ||
| CC3 | 421 MW | combined cycle | 2022 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Tanjung Kidurong power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Tanjung Kidurong power station is located in Sarawak, Malaysia, at approximately 3.2899, 113.0942. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tanjung Kidurong power station is owned by Sarawak Energy Bhd. Across the dataset, Sarawak Energy Bhd is linked to 17 power plants with 5.85 GW of operating capacity.
Frequently asked questions
What is the capacity of Tanjung Kidurong power station?
Tanjung Kidurong power station has a capacity of 1.16 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Tanjung Kidurong power station?
Tanjung Kidurong power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Tanjung Kidurong power station?
Tanjung Kidurong power station is owned by Sarawak Energy Bhd.
Where is Tanjung Kidurong power station located?
It is located in Sarawak, Malaysia. Approximate coordinates: 3.2899, 113.0942.
Is Tanjung Kidurong power station operational?
According to the latest data, Tanjung Kidurong power station is in operation. Operating means the facility is built and in commercial service.
When did Tanjung Kidurong power station start operating?
Start year: 2010. Current status: Operating. Its 3 operating units were commissioned between 2010 and 2022.
How much electricity does Tanjung Kidurong power station generate?
Actual output data are not published for every plant. As an indicative estimate, Tanjung Kidurong power station would produce about 4.1 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Tanjung Kidurong power station compared with other facilities in Malaysia?
Tanjung Kidurong power station ranks #7 by capacity among 26 comparable oil & gas facilities tracked in Malaysia.