Global Energy Monitor tracks 2 units or phases at this site (under construction 1.00 GW).
Technology: gas turbine; fuel: natural gas.
Ownership: State of Sarawak.
Why it matters
- The 14th-largest oil- and gas-fired power station in Malaysia by capacity (of 37 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 1.00 GW to Malaysia's oil & gas fleet — equivalent to 5.7% of today's operating oil & gas capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), New Kapar power plant (2.10 GW) and Pengerang Co-generation plant (1.90 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| GT1 | 500 MW | Construction | gas turbine | ||
| GT2 | 500 MW | Construction | gas turbine |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Samalaju Combined Cycle power plant
Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Samalaju Combined Cycle power plant is located in Sarawak, Malaysia, at approximately 3.5376, 113.3150. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Samalaju Combined Cycle power plant is owned by State of Sarawak.
Frequently asked questions
What is the capacity of Samalaju Combined Cycle power plant?
Samalaju Combined Cycle power plant has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Samalaju Combined Cycle power plant?
Samalaju Combined Cycle power plant is a oil- and gas-fired power station. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Who owns Samalaju Combined Cycle power plant?
Samalaju Combined Cycle power plant is owned by State of Sarawak.
Where is Samalaju Combined Cycle power plant located?
It is located in Sarawak, Malaysia. Approximate coordinates: 3.5376, 113.3150.
Is Samalaju Combined Cycle power plant operational?
According to the latest data, Samalaju Combined Cycle power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
How big is Samalaju Combined Cycle power plant compared with other facilities in Malaysia?