Coal · Malaysia

Tanjung Bin power station

Tanjung Bin power station is a 3.10 GW coal-fired power station located in Johor, Malaysia. The facility is currently in operation, with its first unit entering service in 2006.

3.10 GWCapacity
OperatingStatus
2006Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 3.10 GW).

Technology: subcritical, ultra-supercritical; fuel: coal: bituminous.

Ownership: Malakoff Corporation Bhd.

Its 4 operating units were commissioned between 2006 and 2016. 4 operating units have a planned retirement date, the earliest in 2031.

Why it matters

  • The 2nd-largest coal-fired power station in Malaysia by capacity (of 8 operating coal facilities tracked).
  • Provides about 22% of Malaysia's operating coal capacity and roughly 7.7% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 50% for this technology, it would generate roughly 14 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in Malaysia

Malaysia has 13.8 GW of operating coal capacity across 8 plants in the Global Energy Monitor dataset — 34% of the country's total operating power capacity of 40.4 GW.

Other major coal plants in Malaysia include Manjung power station (4.10 GW), Sultan Aziz power station (2.16 GW) and Jimah East power station (2.00 GW).

See the full list: Coal power plants in Malaysia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 700 MW Operating subcritical 2006 2031
Unit 2 700 MW Operating subcritical 2007 2031
Unit 3 700 MW Operating subcritical 2007 2031
Unit 4 1.00 GW Operating ultra-supercritical 2016 2041

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Tanjung Bin power station

Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Tanjung Bin power station is located in Johor, Malaysia, at approximately 1.3340, 103.5422. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Tanjung Bin power station is owned by Malakoff Corporation Bhd. Across the dataset, Malakoff Corporation Bhd is linked to 9 power plants in 4 countries, with 8.97 GW of operating capacity.

Frequently asked questions

What is the capacity of Tanjung Bin power station?

Tanjung Bin power station has a capacity of 3.10 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Tanjung Bin power station?

Tanjung Bin power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Who owns Tanjung Bin power station?

Tanjung Bin power station is owned by Malakoff Corporation Bhd.

Where is Tanjung Bin power station located?

It is located in Johor, Malaysia. Approximate coordinates: 1.3340, 103.5422.

Is Tanjung Bin power station operational?

According to the latest data, Tanjung Bin power station is in operation. Operating means the facility is built and in commercial service.

When did Tanjung Bin power station start operating?

Start year: 2006. Current status: Operating. Its 4 operating units were commissioned between 2006 and 2016. 4 operating units have a planned retirement date, the earliest in 2031.

How much electricity does Tanjung Bin power station generate?

Actual output data are not published for every plant. As an indicative estimate, Tanjung Bin power station would produce about 14 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Tanjung Bin power station compared with other facilities in Malaysia?

Tanjung Bin power station ranks #2 by capacity among 8 comparable coal facilities tracked in Malaysia.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects