Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 2.24 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Edra Energy Sdn Bhd (parent company: China General Nuclear Power Co Ltd).
3 operating units have a planned retirement date, the earliest in 2042.
Why it matters
- The largest oil- and gas-fired power station in Malaysia by capacity, out of 26 operating oil & gas facilities tracked in the country.
- Provides about 13% of Malaysia's operating oil & gas capacity and roughly 5.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 7.9 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include New Kapar power plant (2.10 GW), Pengerang Co-generation plant (1.90 GW) and Perlis power station (1.50 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 747 MW | combined cycle | 2021 | 2042 | |
| 2 | 747 MW | combined cycle | 2021 | 2042 | |
| 3 | 747 MW | combined cycle | 2021 | 2042 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Alor Gajah (Melaka) power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Alor Gajah (Melaka) power station is located in Melaka, Malaysia, at approximately 2.3822, 102.2116. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Alor Gajah (Melaka) power station is owned by Edra Energy Sdn Bhd. The ultimate parent company is China General Nuclear Power Co Ltd. Across the dataset, China General Nuclear Power Co Ltd is linked to 12 power plants in 5 countries, with 13.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Alor Gajah (Melaka) power station?
Alor Gajah (Melaka) power station has a capacity of 2.24 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Alor Gajah (Melaka) power station?
Alor Gajah (Melaka) power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Alor Gajah (Melaka) power station?
Alor Gajah (Melaka) power station is owned by Edra Energy Sdn Bhd. The ultimate parent company is China General Nuclear Power Co Ltd.
Where is Alor Gajah (Melaka) power station located?
It is located in Melaka, Malaysia. Approximate coordinates: 2.3822, 102.2116.
Is Alor Gajah (Melaka) power station operational?
According to the latest data, Alor Gajah (Melaka) power station is in operation. Operating means the facility is built and in commercial service.
When did Alor Gajah (Melaka) power station start operating?
Start year: 2021. Current status: Operating. 3 operating units have a planned retirement date, the earliest in 2042.
How much electricity does Alor Gajah (Melaka) power station generate?
Actual output data are not published for every plant. As an indicative estimate, Alor Gajah (Melaka) power station would produce about 7.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Alor Gajah (Melaka) power station compared with other facilities in Malaysia?
Alor Gajah (Melaka) power station ranks #1 by capacity among 26 comparable oil & gas facilities tracked in Malaysia.