Alor Gajah (Melaka) power station is a 2.24 GW oil- and gas-fired power station located in Melaka, Malaysia. The facility is currently in operation, with its first unit entering service in 2021.

2.24 GWCapacity
OperatingStatus
2021Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 2.24 GW).

Technology: combined cycle; fuel: natural gas.

Ownership: Edra Energy Sdn Bhd (parent company: China General Nuclear Power Co Ltd).

3 operating units have a planned retirement date, the earliest in 2042.

Why it matters

  • The largest oil- and gas-fired power station in Malaysia by capacity, out of 26 operating oil & gas facilities tracked in the country.
  • Provides about 13% of Malaysia's operating oil & gas capacity and roughly 5.5% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 7.9 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Malaysia

Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.

The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.

Other major oil & gas plants in Malaysia include New Kapar power plant (2.10 GW), Pengerang Co-generation plant (1.90 GW) and Perlis power station (1.50 GW).

See the full list: Gas & oil power plants in Malaysia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 747 MW Operating combined cycle 2021 2042
2 747 MW Operating combined cycle 2021 2042
3 747 MW Operating combined cycle 2021 2042

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Alor Gajah (Melaka) power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Alor Gajah (Melaka) power station is located in Melaka, Malaysia, at approximately 2.3822, 102.2116. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Alor Gajah (Melaka) power station is owned by Edra Energy Sdn Bhd. The ultimate parent company is China General Nuclear Power Co Ltd. Across the dataset, China General Nuclear Power Co Ltd is linked to 12 power plants in 5 countries, with 13.9 GW of operating capacity.

Frequently asked questions

What is the capacity of Alor Gajah (Melaka) power station?

Alor Gajah (Melaka) power station has a capacity of 2.24 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Alor Gajah (Melaka) power station?

Alor Gajah (Melaka) power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Alor Gajah (Melaka) power station?

Alor Gajah (Melaka) power station is owned by Edra Energy Sdn Bhd. The ultimate parent company is China General Nuclear Power Co Ltd.

Where is Alor Gajah (Melaka) power station located?

It is located in Melaka, Malaysia. Approximate coordinates: 2.3822, 102.2116.

Is Alor Gajah (Melaka) power station operational?

According to the latest data, Alor Gajah (Melaka) power station is in operation. Operating means the facility is built and in commercial service.

When did Alor Gajah (Melaka) power station start operating?

Start year: 2021. Current status: Operating. 3 operating units have a planned retirement date, the earliest in 2042.

How much electricity does Alor Gajah (Melaka) power station generate?

Actual output data are not published for every plant. As an indicative estimate, Alor Gajah (Melaka) power station would produce about 7.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Alor Gajah (Melaka) power station compared with other facilities in Malaysia?

Alor Gajah (Melaka) power station ranks #1 by capacity among 26 comparable oil & gas facilities tracked in Malaysia.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects