Overview
Technology: combined cycle; fuel: natural gas.
Ownership: TNB Power Generation Sdn Bhd; Widad Business Group Sdn Bhd (parent company: Tenaga Nasional Bhd; Widad Business Group Sdn Bhd).
Why it matters
- The 2nd-largest oil- and gas-fired power station in Malaysia by capacity (of 37 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 2.10 GW to Malaysia's oil & gas fleet — equivalent to 12% of today's operating oil & gas capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Malaysia
Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.
The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.
Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), Pengerang Co-generation plant (1.90 GW) and Perlis power station (1.50 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 2.10 GW | Construction | combined cycle | 2031 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at New Kapar power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
New Kapar power plant is located in Selangor, Malaysia, at approximately 3.1250, 101.3255. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
New Kapar power plant is owned by TNB Power Generation Sdn Bhd; Widad Business Group Sdn Bhd. The ultimate parent company is Tenaga Nasional Bhd; Widad Business Group Sdn Bhd. Across the dataset, Tenaga Nasional Bhd is linked to 35 power plants in 3 countries, with 17.9 GW of operating capacity.
Frequently asked questions
What is the capacity of New Kapar power plant?
New Kapar power plant has a capacity of 2.10 GW according to the latest Global Energy Monitor data.
What type of facility is New Kapar power plant?
New Kapar power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns New Kapar power plant?
New Kapar power plant is owned by TNB Power Generation Sdn Bhd; Widad Business Group Sdn Bhd. The ultimate parent company is Tenaga Nasional Bhd; Widad Business Group Sdn Bhd.
Where is New Kapar power plant located?
It is located in Selangor, Malaysia. Approximate coordinates: 3.1250, 101.3255.
Is New Kapar power plant operational?
According to the latest data, New Kapar power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is New Kapar power plant expected to start?
Start year: 2031. Current status: Construction.
How big is New Kapar power plant compared with other facilities in Malaysia?
New Kapar power plant ranks #2 by capacity among 37 comparable oil & gas facilities tracked in Malaysia.