Oil & gas · Malaysia

Perlis power station

Perlis power station is a 1.50 GW oil- and gas-fired power station located in Perlis, Malaysia. The facility is currently under construction, with a targeted start date of 2003.

1.50 GWCapacity (all phases)
ConstructionStatus
2003Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (under construction 1.50 GW, retired 650 MW).

Technology: combined cycle; fuel: natural gas.

Ownership: Teknologi Tenaga Perlis Consortium Sdn Bhd (parent company: Pesaka Ventures Sdn Bhd; Kinergy Advancement Bhd; Tenaga Nasional Bhd).

1 units have already been retired (2024).

Why it matters

  • The 5th-largest oil- and gas-fired power station in Malaysia by capacity (of 37 operating, under-construction and planned oil & gas facilities tracked).
  • If completed, it would add 1.50 GW to Malaysia's oil & gas fleet — equivalent to 8.6% of today's operating oil & gas capacity.

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Malaysia

Malaysia has 17.4 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 43% of the country's total operating power capacity of 40.4 GW.

The oil & gas pipeline in Malaysia includes 5.22 GW under construction and 5.69 GW at earlier planning stages.

Other major oil & gas plants in Malaysia include Alor Gajah (Melaka) power station (2.24 GW), New Kapar power plant (2.10 GW) and Pengerang Co-generation plant (1.90 GW).

See the full list: Gas & oil power plants in Malaysia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 650 MW Retired combined cycle 2003 2024
2 1.50 GW Construction combined cycle

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Perlis power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Perlis power station is located in Perlis, Malaysia, at approximately 6.3404, 100.1568. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Perlis power station is owned by Teknologi Tenaga Perlis Consortium Sdn Bhd. The ultimate parent company is Pesaka Ventures Sdn Bhd; Kinergy Advancement Bhd; Tenaga Nasional Bhd.

Frequently asked questions

What is the capacity of Perlis power station?

Perlis power station has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Perlis power station?

Perlis power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Perlis power station?

Perlis power station is owned by Teknologi Tenaga Perlis Consortium Sdn Bhd. The ultimate parent company is Pesaka Ventures Sdn Bhd; Kinergy Advancement Bhd; Tenaga Nasional Bhd.

Where is Perlis power station located?

It is located in Perlis, Malaysia. Approximate coordinates: 6.3404, 100.1568.

Is Perlis power station operational?

According to the latest data, Perlis power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Perlis power station expected to start?

Start year: 2003. Current status: Construction. 1 units have already been retired (2024).

How big is Perlis power station compared with other facilities in Malaysia?

Perlis power station ranks #5 by capacity among 37 comparable oil & gas facilities tracked in Malaysia.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects