Oil & gas · United Arab Emirates

Hassyan Clean-Coal Power Project

Hassyan Clean-Coal Power Project is a 2.40 GW oil- and gas-fired power station located in Dubai, United Arab Emirates. The facility is currently in operation, with its first unit entering service in 2022.

2.40 GWCapacity
OperatingStatus
2022Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 10 units or phases at this site (operating 2.40 GW, retired 1.20 GW).

Technology: ultra-supercritical, steam turbine; fuel: coal: unknown, natural gas.

Ownership: Hassyan Energy Phase I PSC (parent company: Dubai Electricity and Water Authority PJSC; ACWA Power Co; Harbin Electric Co Ltd; The Silk Road Fund Co Ltd).

Its 4 operating units were commissioned between 2022 and 2023. 2 units have already been retired (2022).

Why it matters

  • The 6th-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
  • Provides about 5.2% of United Arab Emirates's operating oil & gas capacity and roughly 4% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 8.4 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in United Arab Emirates

United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.

The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.

Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Emirates Global Aluminum Smelter power station (2.99 GW) and Jebel Ali M Power and Desalination Station (2.88 GW).

See the full list: Gas & oil power plants in United Arab Emirates →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1, timepoint 1 600 MW Retired ultra-supercritical 2020 2022
Unit 1, timepoint 2 600 MW Operating steam turbine 2022
Unit 2, timepoint 1 600 MW Retired ultra-supercritical 2021 2022
Unit 2, timepoint 2 600 MW Operating steam turbine 2022
Unit 3 600 MW Cancelled ultra-supercritical
Unit 3 (gas) 600 MW Operating steam turbine 2023
Unit 4 600 MW Cancelled ultra-supercritical
Unit 4 (gas) 600 MW Operating steam turbine 2023
Unit 5 600 MW Cancelled ultra-supercritical
Unit 6 600 MW Cancelled ultra-supercritical

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Hassyan Clean-Coal Power Project

Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Hassyan Clean-Coal Power Project is located in Dubai, United Arab Emirates, at approximately 24.9115, 54.9155. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Hassyan Clean-Coal Power Project is owned by Hassyan Energy Phase I PSC. The ultimate parent company is Dubai Electricity and Water Authority PJSC; ACWA Power Co; Harbin Electric Co Ltd; The Silk Road Fund Co Ltd. Across the dataset, Dubai Electricity and Water Authority PJSC is linked to 12 power plants with 17.7 GW of operating capacity.

Frequently asked questions

What is the capacity of Hassyan Clean-Coal Power Project?

Hassyan Clean-Coal Power Project has a capacity of 2.40 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.

What type of facility is Hassyan Clean-Coal Power Project?

Hassyan Clean-Coal Power Project is a oil- and gas-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.

Who owns Hassyan Clean-Coal Power Project?

Hassyan Clean-Coal Power Project is owned by Hassyan Energy Phase I PSC. The ultimate parent company is Dubai Electricity and Water Authority PJSC; ACWA Power Co; Harbin Electric Co Ltd; The Silk Road Fund Co Ltd.

Where is Hassyan Clean-Coal Power Project located?

It is located in Dubai, United Arab Emirates. Approximate coordinates: 24.9115, 54.9155.

Is Hassyan Clean-Coal Power Project operational?

According to the latest data, Hassyan Clean-Coal Power Project is in operation. Operating means the facility is built and in commercial service.

When did Hassyan Clean-Coal Power Project start operating?

Start year: 2022. Current status: Operating. Its 4 operating units were commissioned between 2022 and 2023. 2 units have already been retired (2022).

How much electricity does Hassyan Clean-Coal Power Project generate?

Actual output data are not published for every plant. As an indicative estimate, Hassyan Clean-Coal Power Project would produce about 8.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Hassyan Clean-Coal Power Project compared with other facilities in United Arab Emirates?

Hassyan Clean-Coal Power Project ranks #6 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects