Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 2.99 GW).
Technology: combined cycle; fuel: natural gas, fossil liquids: fuel oil, natural gas.
Ownership: Emirates Global Aluminium PJSC (parent company: Investment Corporation of Dubai; Mubadala Investment Company PJSC).
Its 2 operating units were commissioned between 1979 and 2021.
Why it matters
- The 2nd-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
- Provides about 6.5% of United Arab Emirates's operating oil & gas capacity and roughly 5% of all operating power capacity in the country in the dataset.
- Ranks #53 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 10 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United Arab Emirates
United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.
The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.
Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Jebel Ali M Power and Desalination Station (2.88 GW) and Al Aweer H Power and Desalination Station (2.81 GW).
See the full list: Gas & oil power plants in United Arab Emirates →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 2.35 GW | combined cycle | 1979 | ||
| H | 640 MW | combined cycle | 2021 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Emirates Global Aluminum Smelter power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Emirates Global Aluminum Smelter power station is located in Dubai, United Arab Emirates, at approximately 25.0448, 55.1558. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Emirates Global Aluminum Smelter power station is owned by Emirates Global Aluminium PJSC. The ultimate parent company is Investment Corporation of Dubai; Mubadala Investment Company PJSC. Across the dataset, Investment Corporation of Dubai is linked to 2 power plants with 6.72 GW of operating capacity.
Frequently asked questions
What is the capacity of Emirates Global Aluminum Smelter power station?
Emirates Global Aluminum Smelter power station has a capacity of 2.99 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Emirates Global Aluminum Smelter power station?
Emirates Global Aluminum Smelter power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Emirates Global Aluminum Smelter power station?
Emirates Global Aluminum Smelter power station is owned by Emirates Global Aluminium PJSC. The ultimate parent company is Investment Corporation of Dubai; Mubadala Investment Company PJSC.
Where is Emirates Global Aluminum Smelter power station located?
It is located in Dubai, United Arab Emirates. Approximate coordinates: 25.0448, 55.1558.
Is Emirates Global Aluminum Smelter power station operational?
According to the latest data, Emirates Global Aluminum Smelter power station is in operation. Operating means the facility is built and in commercial service.
When did Emirates Global Aluminum Smelter power station start operating?
Start year: 1979. Current status: Operating. Its 2 operating units were commissioned between 1979 and 2021.
How much electricity does Emirates Global Aluminum Smelter power station generate?
Actual output data are not published for every plant. As an indicative estimate, Emirates Global Aluminum Smelter power station would produce about 10 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Emirates Global Aluminum Smelter power station compared with other facilities in United Arab Emirates?
Emirates Global Aluminum Smelter power station ranks #2 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.