Country profile
United Arab Emirates energy infrastructure
Global Energy Monitor tracks 203 energy facilities in United Arab Emirates, including power plants with 59.5 GW of operating generating capacity. A further 9.20 GW is under construction and 16.8 GW is in planning stages.
United Arab Emirates's energy system at a glance
United Arab Emirates has 59.5 GW of operating power generation capacity across 86 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 45.9 GW or 77% of the total. It is followed by solar (12%) and nuclear (9.5%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 23% of operating capacity, while coal, oil and gas account for 77%. Wind and solar alone represent 13%.
A further 9.20 GW of generating capacity is under construction, led by solar (7.82 GW). Another 16.8 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 28 gas pipeline projects (about 1,776 km in operation), 5 oil and NGL pipelines, 4 LNG terminals (9.8 mtpa import capacity in operation; 6.0 mtpa export capacity in operation) and 47 oil and gas fields (35 producing) in United Arab Emirates.
Operating power capacity by technology
- Oil & gas 45.9 GW 77%
- Solar 7.34 GW 12%
- Nuclear 5.67 GW 9.5%
- Hydropower 250 MW 0.4%
- Bioenergy 220 MW 0.4%
- Wind 99 MW 0.2%
Largest power plants in United Arab Emirates
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Barakah nuclear power plantAbu Dhabi | Nuclear | 5.67 GW | 2021 | |
| 2 | Masdar-Abu Dhabi solar farmAbu Dhabi | Solar | 5.20 GW | Construction | 2027 |
| 3 | Emirates Aluminum Smelter Complex power stationAbu Dhabi | Oil & gas | 3.73 GW | 2009 | |
| 4 | Mohammed Bin Rashid Al Maktoum Solar ParkEmirate of Dubai | Solar | 3.46 GW | 2013 | |
| 5 | Al-Nouf Power PlantAbu Dhabi | Oil & gas | 3.30 GW | Pre-construction | 2029 |
| 6 | Emirates Global Aluminum Smelter power stationDubai | Oil & gas | 2.99 GW | 1979 | |
| 7 | Jebel Ali M Power and Desalination StationDubai | Oil & gas | 2.88 GW | 2013 | |
| 8 | Al Aweer H Power and Desalination StationDubai | Oil & gas | 2.81 GW | 1998 | |
| 9 | Taweelah C Independent Power Producer (IPP)Abu Dhabi | Oil & gas | 2.50 GW | Pre-construction | 2028 |
| 10 | Jebel Ali L Power and Desalination StationDubai | Oil & gas | 2.40 GW | 2005 |
Pipeline: capacity under construction
- Solar 7.82 GW 85%
- Oil & gas 1.38 GW 15%
Gas & oil power plants in United Arab Emirates
See all 39 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Emirates Aluminum Smelter Complex power stationAbu Dhabi | Oil & gas | 3.73 GW | 2009 | |
| 2 | Al-Nouf Power PlantAbu Dhabi | Oil & gas | 3.30 GW | Pre-construction | 2029 |
| 3 | Emirates Global Aluminum Smelter power stationDubai | Oil & gas | 2.99 GW | 1979 | |
| 4 | Jebel Ali M Power and Desalination StationDubai | Oil & gas | 2.88 GW | 2013 | |
| 5 | Al Aweer H Power and Desalination StationDubai | Oil & gas | 2.81 GW | 1998 |
Nuclear power plants in United Arab Emirates
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Barakah nuclear power plantAbu Dhabi | Nuclear | 5.67 GW | 2021 |
Hydropower plants in United Arab Emirates
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Al Hattawi Dam hydroelectric plantDubai | Hydropower | 250 MW | 2025 |
Wind farms in United Arab Emirates
See all 5 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | New Al Sila wind farmAbu Dhabi | Wind | 140 MW | Pre-construction | |
| 2 | Sir Bani Yas Island wind farmAbu Dhabi | Wind | 45 MW | 2023 | |
| 3 | Hatta wind farmDubai | Wind | 28 MW | Shelved | |
| 4 | Al Sila wind farmAbu Dhabi | Wind | 27 MW | 2023 | |
| 5 | Delma Island wind farm | Wind | 27 MW | 2023 |
Solar farms in United Arab Emirates
See all 64 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Masdar-Abu Dhabi solar farmAbu Dhabi | Solar | 5.20 GW | Construction | 2027 |
| 2 | Mohammed Bin Rashid Al Maktoum Solar ParkEmirate of Dubai | Solar | 3.46 GW | 2013 | |
| 3 | Al Dhafra solar farmEmirate of Abu Dhabi | Solar | 2.00 GW | 2022 | |
| 4 | Masdar-Engie Green Hydrogen solar farmAbu Dhabi Emirate | Solar | 2.00 GW | Announced | 2030 |
| 5 | Taqa-KIZAD Green Ammonia solar farmAbu Dhabi | Solar | 2.00 GW | Shelved |
Bioenergy power plants in United Arab Emirates
See all 5 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Dubai Waste Management Centre power stationDubai | Bioenergy | 190 MW | 2023 | |
| 2 | Al Dhafra Waste Incinerator power stationAbu Dhabi | Bioenergy | 80 MW | Pre-construction | 2027 |
| 3 | Tadweer Al Ain Waste Incinerator power stationAbu Dhabi | Bioenergy | 60 MW | Announced | 2027 |
| 4 | Sharjah Waste-to-Energy PlantSharjah | Bioenergy | 30 MW | 2022 | |
| 5 | Al Qusais Landfill power stationDubai | Bioenergy | 13 MW | Retired | 2014 |
Gas pipelines in United Arab Emirates
See all 28 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Dolphin Qatar–UAE Natural Gas PipelineAl Khor | Gas pipeline | 32.7 bcm/y | 2006 | |
| 2 | Sajaa–Hamriya Gas PipelineSharjah | Gas pipeline | 10.3 bcm/y | 2008 | |
| 3 | Taweelah-Jebel Ali Gas PipelineAbu Dhabi | Gas pipeline | 9.20 bcm/y | 2001 | |
| 4 | Das Island–Habshan Gas PipelinePersian Gulf | Gas pipeline | 4.09 bcm/y | 2018 | |
| 5 | Das Island–Habshan Gas PipelineAbu Dhabi | Gas pipeline | 4.09 bcm/y | 2018 |
Oil & NGL pipelines in United Arab Emirates
See all 5 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Bab-HabshanâFujairah Oil PipelineFujairah | Oil pipeline | 1,800,000 boe/d | 2012 | |
| 2 | Upper Zakum-Das Island Oil PipelineAbu Dhabi | Oil pipeline | 310,000 boe/d | 2001 | |
| 3 | Bab-HabshanâJebel Dhanna Oil PipelineAbu Dhabi | Oil pipeline | |||
| 4 | Umm Shaif-Das Island oil pipelineAbu Dhabi | Oil pipeline | |||
| 5 | Upper Zakum-Zirku Island Oil PipelineAbu Dhabi | Oil pipeline |
LNG terminals in United Arab Emirates
See all 4 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ruwais LNG TerminalAbu Dhabi | LNG export terminal | 9.60 mtpa | Construction | |
| 2 | Das Island LNG TerminalAbu Dhabi | LNG export terminal | 6.00 mtpa | 1977 | |
| 3 | Jebel Ali FLNG TerminalDubai | LNG import terminal | 6.00 mtpa | 2010 | |
| 4 | Ruwais FSRUAbu Dhabi | LNG import terminal | 3.80 mtpa | 2016 |
Oil & gas fields in United Arab Emirates
See all 47 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Upper Zakum Oil Field (United Arab Emirates) | Oil & gas field | 299 million boe/y | 1982 | |
| 2 | Asab Oil Field (United Arab Emirates) | Oil & gas field | 164 million boe/y | 1970 | |
| 3 | Bab Oil and Gas Field (United Arab Emirates) | Oil & gas field | 164 million boe/y | 1960 | |
| 4 | Umm Shaif Oil and Gas Field (United Arab Emirates) | Oil & gas field | 100 million boe/y | 1962 | |
| 5 | Al-Dabbiya Oil and Gas Field (United Arab Emirates) | Oil & gas field | 58.4 million boe/y | 2005 |
Frequently asked questions
How much power generation capacity does United Arab Emirates have?
Global Energy Monitor tracks 59.5 GW of operating power plant capacity in United Arab Emirates, counting plants of all technologies above the trackers' size thresholds.
What is the largest power plant in United Arab Emirates?
The largest power plant in United Arab Emirates in the dataset is Barakah nuclear power plant, a 5.67 GW nuclear plant.
What share of United Arab Emirates's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 13% of operating power capacity in United Arab Emirates. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does United Arab Emirates have nuclear power plants?
Yes. United Arab Emirates has 1 operating nuclear power plants with a combined 5.67 GW of capacity.
Does United Arab Emirates have LNG terminals?
Yes. The dataset lists 4 LNG terminal projects in United Arab Emirates. Operating import capacity: 9.8 mtpa. Operating export capacity: 6.0 mtpa.
Energy news from United Arab Emirates
Iran and Oman Hold Hormuz Security Talks as Tanker Mine Attacks Surge
Countries With the Most Nuclear Reactors
ADNOC Company Profile: Business and Global Expansion
US Shale Oil Explained: Basins, Output and Costs
Hail and Ghasha Sour Gas Development: Owner, Capacity and Timeline
Largest Solar Farms in the World