Bioenergy power plants in United Arab Emirates
This list ranks all 5 bioenergy power plants tracked in United Arab Emirates by capacity, including operating, under-construction, planned, shelved and retired projects. 2 of them are operating, with a combined capacity of 220 MW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Dubai Waste Management Centre power stationDubai | Bioenergy | 190 MW | 2023 | |
| 2 | Al Dhafra Waste Incinerator power stationAbu Dhabi | Bioenergy | 80 MW | Pre-construction | 2027 |
| 3 | Tadweer Al Ain Waste Incinerator power stationAbu Dhabi | Bioenergy | 60 MW | Announced | 2027 |
| 4 | Sharjah Waste-to-Energy PlantSharjah | Bioenergy | 30 MW | 2022 | |
| 5 | Al Qusais Landfill power stationDubai | Bioenergy | 13 MW | Retired | 2014 |