Taweelah A1 power plant is a 1.67 GW oil- and gas-fired power station located in Abu Dhabi, United Arab Emirates. The facility is currently in operation, with its first unit entering service in 2009.

1.67 GWCapacity
OperatingStatus
2009Start year
View on the interactive map →

Overview

Technology: combined cycle; fuel: natural gas.

Ownership: Total Tractebel Emirates O&M Co SA (parent company: ENGIE SA; TotalEnergies SE).

Why it matters

  • The 14th-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
  • Provides about 3.6% of United Arab Emirates's operating oil & gas capacity and roughly 2.8% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 5.9 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in United Arab Emirates

United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.

The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.

Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Emirates Global Aluminum Smelter power station (2.99 GW) and Jebel Ali M Power and Desalination Station (2.88 GW).

See the full list: Gas & oil power plants in United Arab Emirates →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 1.67 GW Operating combined cycle 2009 2029

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Taweelah A1 power plant

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Taweelah A1 power plant is located in Abu Dhabi, United Arab Emirates, at approximately 24.7604, 54.6797. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Taweelah A1 power plant is owned by Total Tractebel Emirates O&M Co SA. The ultimate parent company is ENGIE SA; TotalEnergies SE. Across the dataset, ENGIE SA is linked to 388 power plants in 33 countries, with 59.1 GW of operating capacity.

Frequently asked questions

What is the capacity of Taweelah A1 power plant?

Taweelah A1 power plant has a capacity of 1.67 GW according to the latest Global Energy Monitor data.

What type of facility is Taweelah A1 power plant?

Taweelah A1 power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Taweelah A1 power plant?

Taweelah A1 power plant is owned by Total Tractebel Emirates O&M Co SA. The ultimate parent company is ENGIE SA; TotalEnergies SE.

Where is Taweelah A1 power plant located?

It is located in Abu Dhabi, United Arab Emirates. Approximate coordinates: 24.7604, 54.6797.

Is Taweelah A1 power plant operational?

According to the latest data, Taweelah A1 power plant is in operation. Operating means the facility is built and in commercial service.

When did Taweelah A1 power plant start operating?

Start year: 2009. Current status: Operating.

How much electricity does Taweelah A1 power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Taweelah A1 power plant would produce about 5.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Taweelah A1 power plant compared with other facilities in United Arab Emirates?

Taweelah A1 power plant ranks #14 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.