Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.70 GW).
Technology: gas turbine, combined cycle; fuel: natural gas.
Ownership: Mirfa International Power and Water Company PJSC (parent company: Abu Dhabi Water and Electricity Authority; ENGIE SA; Sojitz Corp).
5 operating units have a planned retirement date, the earliest in 2042.
Why it matters
- The 13th-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
- Provides about 3.7% of United Arab Emirates's operating oil & gas capacity and roughly 2.9% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.9 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United Arab Emirates
United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.
The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.
Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Emirates Global Aluminum Smelter power station (2.99 GW) and Jebel Ali M Power and Desalination Station (2.88 GW).
See the full list: Gas & oil power plants in United Arab Emirates →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 90 MW | gas turbine | 2017 | 2042 | |
| 2 | 90 MW | gas turbine | 2017 | 2042 | |
| 3 | 90 MW | gas turbine | 2017 | 2042 | |
| 4 | 90 MW | gas turbine | 2017 | 2042 | |
| CC | 1.34 GW | combined cycle | 2017 | 2042 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Mirfa Independent Water and Power Project
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Mirfa Independent Water and Power Project is located in Abu Dhabi, United Arab Emirates, at approximately 24.1210, 53.4470. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Mirfa Independent Water and Power Project is owned by Mirfa International Power and Water Company PJSC. The ultimate parent company is Abu Dhabi Water and Electricity Authority; ENGIE SA; Sojitz Corp. Across the dataset, Abu Dhabi Water and Electricity Authority is linked to 3 power plants with 4.22 GW of operating capacity.
Frequently asked questions
What is the capacity of Mirfa Independent Water and Power Project?
Mirfa Independent Water and Power Project has a capacity of 1.70 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Mirfa Independent Water and Power Project?
Mirfa Independent Water and Power Project is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Mirfa Independent Water and Power Project?
Mirfa Independent Water and Power Project is owned by Mirfa International Power and Water Company PJSC. The ultimate parent company is Abu Dhabi Water and Electricity Authority; ENGIE SA; Sojitz Corp.
Where is Mirfa Independent Water and Power Project located?
It is located in Abu Dhabi, United Arab Emirates. Approximate coordinates: 24.1210, 53.4470.
Is Mirfa Independent Water and Power Project operational?
According to the latest data, Mirfa Independent Water and Power Project is in operation. Operating means the facility is built and in commercial service.
When did Mirfa Independent Water and Power Project start operating?
Start year: 2017. Current status: Operating. 5 operating units have a planned retirement date, the earliest in 2042.
How much electricity does Mirfa Independent Water and Power Project generate?
Actual output data are not published for every plant. As an indicative estimate, Mirfa Independent Water and Power Project would produce about 5.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Mirfa Independent Water and Power Project compared with other facilities in United Arab Emirates?
Mirfa Independent Water and Power Project ranks #13 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.