Oil & gas · United Arab Emirates

Umm Al Nar West and East Integrated Water and power plant

Umm Al Nar West and East Integrated Water and power plant is a 1.71 GW oil- and gas-fired power station located in Abu Dhabi, United Arab Emirates. The facility is currently in operation, with its first unit entering service in 2007.

1.71 GWCapacity
OperatingStatus
2007Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 11 units or phases at this site (operating 1.71 GW, retired 778 MW).

Technology: combined cycle, gas turbine, steam turbine; fuel: natural gas, natural gas, fossil liquids: fuel oil.

Ownership: Arabian Power Company PJSC (parent company: Arabian United Power Company PJSC; ENGIE SA; Chubu Electric Power Co Inc; Tokyo Electric Power Co).

10 units have already been retired (2021). 1 operating units have a planned retirement date, the earliest in 2027.

Why it matters

  • The 12th-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
  • Provides about 3.7% of United Arab Emirates's operating oil & gas capacity and roughly 2.9% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 6.0 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in United Arab Emirates

United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.

The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.

Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Emirates Global Aluminum Smelter power station (2.99 GW) and Jebel Ali M Power and Desalination Station (2.88 GW).

See the full list: Gas & oil power plants in United Arab Emirates →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
CC1 1.71 GW Operating combined cycle 2007 2027
GT01 59 MW Retired gas turbine 1979 2021
GT02 59 MW Retired gas turbine 1979 2021
ST1 60 MW Retired steam turbine 1981 2021
ST2 60 MW Retired steam turbine 1981 2021
ST3 60 MW Retired steam turbine 1981 2021
ST4 60 MW Retired steam turbine 1981 2021
ST5 60 MW Retired steam turbine 1981 2021
ST6 60 MW Retired steam turbine 1981 2021
ST7 150 MW Retired steam turbine 1998 2021
ST8 150 MW Retired steam turbine 1998 2021

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Umm Al Nar West and East Integrated Water and power plant

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Umm Al Nar West and East Integrated Water and power plant is located in Abu Dhabi, United Arab Emirates, at approximately 24.4348, 54.4876. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Umm Al Nar West and East Integrated Water and power plant is owned by Arabian Power Company PJSC. The ultimate parent company is Arabian United Power Company PJSC; ENGIE SA; Chubu Electric Power Co Inc; Tokyo Electric Power Co.

Frequently asked questions

What is the capacity of Umm Al Nar West and East Integrated Water and power plant?

Umm Al Nar West and East Integrated Water and power plant has a capacity of 1.71 GW according to the latest Global Energy Monitor data. This figure covers the 11 units or phases listed for the site.

What type of facility is Umm Al Nar West and East Integrated Water and power plant?

Umm Al Nar West and East Integrated Water and power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Umm Al Nar West and East Integrated Water and power plant?

Umm Al Nar West and East Integrated Water and power plant is owned by Arabian Power Company PJSC. The ultimate parent company is Arabian United Power Company PJSC; ENGIE SA; Chubu Electric Power Co Inc; Tokyo Electric Power Co.

Where is Umm Al Nar West and East Integrated Water and power plant located?

It is located in Abu Dhabi, United Arab Emirates. Approximate coordinates: 24.4348, 54.4876.

Is Umm Al Nar West and East Integrated Water and power plant operational?

According to the latest data, Umm Al Nar West and East Integrated Water and power plant is in operation. Operating means the facility is built and in commercial service.

When did Umm Al Nar West and East Integrated Water and power plant start operating?

Start year: 2007. Current status: Operating. 10 units have already been retired (2021). 1 operating units have a planned retirement date, the earliest in 2027.

How much electricity does Umm Al Nar West and East Integrated Water and power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Umm Al Nar West and East Integrated Water and power plant would produce about 6.0 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Umm Al Nar West and East Integrated Water and power plant compared with other facilities in United Arab Emirates?

Umm Al Nar West and East Integrated Water and power plant ranks #12 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects